Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Singapore

Singapore, Singapore - sg/27

Thomson Line

Closing Date: 12.06.2013 (Tender Closed)

Pre-qualification notice, deadline 12.06.2013, for the power supply system (Contract T253) for the 30 km Thomson Line (TSL). Contact LTA, att.n Ms Low Bee Eng/Ms Lim Pi Feei, tel 65-6396 1202/1623, fax  65-6396 1124, e-mail lta_contracts@lta.gov.sg. Visit http://app.lta.gov.sg/data/apps/tender/doc/3662/T253_PQ%20Notice_rev.pdf and http://www.gebiz.gov.sg/scripts/main.do?doctype=PQ&doc=LTA000EPQ13000016. Bid Code LTA000EPQ13000016. 21/13.



Permalink

Singapore, Downtown - sg/23

Metro

Open invitation to tender, deadline 12th March, 2007 for design, construction and completion of tunnels between Promenade station and Marina Bay (contract 905, ITT No. LTA000ETT06000160) for the Downtown line, Phase 1. Contact Land and Transport Authority, Ms Low Bee Eng or Ms Monica Wong, tel. +65 63961205 / 1202, fax +65 63961124, e-mail lta_contracts@lta.gov.sg, bee_eng_low@lta.gov.sg and monica_wong@lta.gov.sg. Visit www.gebiz.gov.sg Open invitation to tender, deadline 5th February, 2007 for design, construction and completion of Cross Street station and associated tunnels (contract 908, ITT No. LTA000ETT06000126) for the Downtown line, Phase 1. Contact Land and Transport Authority, Ms Low Bee Eng or Ms Monica Wong, tel. +65 63961205 / 1202, fax +65 63961124, e-mail bee_eng_low@lta.gov.sg and monica_wong@lta.gov.sg. Visit www.gebiz.gov.sgOpen invitation to tender, deadline 8th February, 2007 for design, construction and completion of Chinatown station and associated tunnels (contract 909, ITT No. LTA000ETT06000125) for the Downtown line, Phase 1. Contact Land and Transport Authority, Ms Low Bee Eng or Ms Monica Wong, tel. +65 63961205 / 1202, fax +65 63961124, e-mail bee_eng_low@lta.gov.sg and monica_wong@lta.gov.sg. Visit www.gebiz.gov.sgThe Downtown line extension is a 3.4-km long, fully underground section with five stations (Promenade, Bayfront, Landmark, Cross Street, Chinatown), which will run from the Circle line's Millenia station at Temasek Avenue along Cross Street to link up with the North East line's Chinatown station. 01-02/07.Invitation to tender, deadline 14th September, 2007 for construction and completion of Bayfront station including associated tunnels (contract 906) for Downtown Line Stage 1. Contact Land Transport Authority, Ms Monica Wong or Ms Low Bee Eng, fax +65 63961124. Visit http://www.lta.gov.sg/tender_info/index_tender_info.htm 36/07.Invitation to tender, deadline 14th September, 2007 for construction and completion of Landmark station including associated tunnels (contract 907) for Downtown Line Stage 1. Contact Land Transport Authority, Ms Monica Wong or Ms Low Bee Eng, fax +65 63961124. Visit www.lta.gov.sg/tender_info/index_tender_info.htm 36/07.Invitation to tender, deadline 7th September, 2007 for advanced engineering study (contract 9151) for proposed Downtown Line Stage 2 (Section 1). Contact Land Transport Authority, Ms Chan Mei Yin or Ms Low Bee Eng, fax +65 63961124. Visit www.lta.gov.sg/tender_info/index_tender_info.htm 36/07.Invitation to tender, deadline 7th September, 2007 for advanced engineering study (contract 9152) for proposed Downtown Line Stage 2 (Section 2). Contact Land Transport Authority, Ms Chan Mei Yin or Ms Low Bee Eng, fax +65 63961124. Visit www.lta.gov.sg/tender_info/index_tender_info.htm 36/07.Excavation and structural work on the SGD12 billion Downtown Line (DTL) will be started during the last quarter of 2007. The Land Transport Authority (LTA) awarded contracts for Phase 1 of the DTL worth nearly SGD500 million to three construction firms which have extensive experience in large-scale projects in Singapore. The first deal (contract 905) went to Japanese construction giant Shimizu, which bagged a SGD102.8 million contract to design and build tunnels between the Promenade station, Marina Bay and the integrated resort (IR) development. Visit www.shimz.com.sgThe second contract (contract 908) goes to the Samsung-Soletanche Bachy joint venture with a contract worth SGD224.9 million to design and build Cross Street station and associated tunnels. The work will involve the construction of a temporary two-lane viaduct along Cross Street from Central Boulevard to keep traffic in the area flowing smoothly as construction work goes on. Visit www.secc.co.kr/e_secc/index.asp and www.bachy-soletanche.com.sgThe third contract (contract 909) has been awarded to Gammon Construction, which will design and build DTL's Chinatown station and the tunnels connected to it. The contract is worth SGD160.3 million. Gammon Construction built the existing Chinatown station on the North-East Line (NEL). Visit www.gammonconstruction.comThe 4.3 km first stage of the DTL, due for completion in 2013, will connect Bugis station on the East-West Line (EWL) to Chinatown station on the NEL. The DTL will have six stations and will provide a vital link to new developments such as the Marina Bay Financial Centre and the Marina Bay Sands Integrated Resort. Read E-News Weekly 24/2007, 12/2007 & 1/2007. Visit www.lta.gov.sg 36/07.The Land Transport Authority (LTA) has awarded Taisei Corporation the civil works contract 907 for the Landmark station, tunnels and the main trunk road above the station, as part of Stage 1 of the Downtown Line (DTL). The contract is valued at SGD230 million. Visit www.taisei.com 10/08.Contract 906 for the Bayfront station has been awarded to Sembawang Engineers & Constructors. The contract is valued at SGD463 million. The scope of the contract covers the construction and completion of the Bayfront station including associated tunnels. The Bayfront station will serve as an interchange station for the Circle and Downtown lines with the station's twin-stacked tunnels connected to the Marina Bay and Landmark stations. Visit www.sembawangenc.com 10/08.To date, five contracts have been awarded for Stage 1. The remaining two contracts, for Bugis and Promenade stations and tunnels, will be awarded by year-end. The LTA on 12th February marked the start of construction of Stage 1 of the 40 km line with a groundbreaking ceremony for the Chinatown station. The 4.3 km fully underground Stage 1 comprises six stations (Chinatown, Cross Street, Landmark, Bayfront, Promenade and Bugis) and will be completed by 2013. The DTL will be built in three stages, with Stage 2 to be completed in 2015 and Stage 3 in 2016. Read E-News Weekly 24/2007, 12/2007 & 1/2007. 10/08.Prequalification, deadline 20th June, 2008 for the design, supply, installation, testing, commissioning and putting into service of major electrical and mechanical systems for the Downtown Line (contracts 953, 976 and 977). Contract 953 is for the power supply system. Contract 976 is for wagons and contract 977 is for locomotives. The Downtown Line will consist of 33 underground stations and some of which will serve as civil defence shelters. The line is approximately 40 km long. Contact Land Transport Authority (LTA), Tender Division, 1 Hampshire Road, Block 2, Level 1, Singapore 219428 or Ms Monica Wong and Ms Low Bee Eng, tel. +65 63961205 / 1202, fax +65 63961124, e-mail lta_contracts@lta.gov.sg 22/08.Tender notice, deadline 15th September, 2008 for construction and completion of the Bugis station including associated tunnels (contract 903) for the Downtown Line, Phase 1. The station is to be an interchange with the East West Line (EWL). Contact Land Transport Authority (LTA), Tender Division, 1 Hampshire Road, Block 2, Level 1, Singapore 219428 or Ms Monica Wong and Ms Low Bee Eng, tel. +65 63961205 / 1202, fax +65 63961124, e-mail lta_contracts@lta.gov.sg or visit www.gebiz.gov.sg 30/08.Tender notice, deadline 14th November, 2008 for design, construction and completion of the Beauty World station and tunnels (contract 916) for the Downtown Line, Phase 2. Contact Land Transport Authority (LTA), Tender Division, 1 Hampshire Road, Block 2, Level 1, Singapore 219428 or Ms Chan Mei Yin and Ms Low Bee Eng, tel. +65 63961190 / 1202, fax +65 63961124, e-mail lta_contracts@lta.gov.sg or visit www.gebiz.gov.sg 30/08.The Land Transport Authority (LTA) has awarded a SGD231.9 million contract for the design, construction and completion of the Downtown Line 1 Promenade station and its associated tunnels to Shanghai Tunnel Engineering Co. (STEC). The Downtown Line 1 Promenade station is adjacent to the existing Circle Line Promenade station and will be constructed below the Circle Line Promenade station. Construction is scheduled to commence in the last quarter of 2008 and is targeted to be completed in 2013. When completed, Downtown Line 1 will be a 4.3 km fully underground rail transit system with six stations that will connect the East-West Line at Bugis station to the North-East Line at Chinatown station. Visit www.stec.net or www.tunnelling.cn 34-35/08.Invitation to tender, deadline 9th January, 2009 for design and construction of stations at Petir and tunnels (contract 912) for the Downtown Line Stage 2. Contact Land Transport Authority (LTA), Tender division, Ms Chan Mei Yin / Ms Low Bee Eng, tel. +65 63961190 / 1202, fax +65 63961124, e-mail lta_contracts@lta.gov.sg 41/08.Invitation to tender, deadline 23rd January, 2009 for design and construction of tunnels between stations at Beauty World and Hillview (contract 915) for the Downtown Line Stage 2. Contact Land Transport Authority (LTA), Tender division, Ms Chan Mei Yin / Ms Low Bee Eng, tel. +65 63961190 / 1202, fax +65 63961124, e-mail lta_contracts@lta.gov.sg 41/08.Invitation to tender, deadline 14th November, 2008 for design and construction of station at Beauty World and tunnels (contract 916) for the Downtown Line Stage 2. Contact Land Transport Authority (LTA), Tender division, Ms Chan Mei Yin / Ms Low Bee Eng, tel. +65 63961190 / 1202, fax +65 63961124, e-mail lta_contracts@lta.gov.sg 41/08.Invitation to tender, deadline 28th November, 2008 for design and construction of stations and tunnels at Rochor and Little India (contract 921) for the Downtown Line Stage 2. Contact Land Transport Authority (LTA), Tender division, Ms Chan Mei Yin / Ms Low Bee Eng, tel. +65 63961190 / 1202, fax +65 63961124, e-mail lta_contracts@lta.gov.sg 41/08.Invitation to tender, deadline 30th December, 2008 for electrical and mechanical consultancy services (contract 9158A) for the Downtown Line Stage 2. Contact Land Transport Authority (LTA), Tender division, Ms Chan Mei Yin / Ms Low Bee Eng, tel. +65 63961190 / 1202, fax +65 63961124, e-mail lta_contracts@lta.gov.sg 41/08.Invitation to tender, deadline 30th December, 2008 for electrical and mechanical consultancy services (contract 9158B) for the Downtown Line Stage 3. Contact Land Transport Authority (LTA), Tender division, Ms Chan Mei Yin / Ms Low Bee Eng, tel. +65 63961190 / 1202, fax +65 63961124, e-mail lta_contracts@lta.gov.sg 41/08.



Permalink

Singapore, - sg/15

Circle Line - Metro

Circle Line - sg/15Metro Feasibility study by LTA for an orbital metro route connecting the suburbs to the west, north and east of the island's city centre. Preferred route links Paya Lebar on the West line to Bishan on the MRT North line, Serangoon on the North East line and Buona Vista on the East line. Construction to start 2005, following completion of the NEL, Changi Airport branch and the first phase of the Marina line. Island's rail network will be virtually doubled from 83 to 154 route-km by 2005. Four more metro routes are included in the long-term development strategy for completion by 2030, with the ring line to be followed by new routes serving Jurong, Bukit Timah and Tampines in the east. December 1999.   First stage now called Marina Line Extension, from Boulevard station at national stadium to rail staging yards at Upper Paya Lebar. Tenders for consultancy contract have closed and announcement of award pending. Visit www.gov.sg/gitis/ 15/01.   Invitation by LTA to contractors to pre-qualify for Stage 2 with route length 5.5 km from Stadium Boulevard with stations at Old Airport Road (OAR), Tanjong Katong (TKT), Paya Lebar (PYL), Macpherson (MPS) and Upper Paya Lebar (UPL), and an underground depot at Kim Chuan. PYL station will interchange with the existing Paya Lebar (East-West Line) MRT station. All stations except PYL and UPL will be designed as underground civil defence stations. Visit www.gov.sg/gitis and www.lta.gov.sg 35/01. Maunsell Consultants proceeding with $436m design contract for Circle Line second stage, with 5.5 km of bored and cut-and-cover tunnels and five underground stations. Construction to start by end-2002 for completion in 2006. Visit www.lta.gov.sg/projects 42/01. A jv of Econ Corporation Ltd and NCC has been awarded contract C822 for approximately S$338.6 million for construction of the MacPherson and Upper Paya Lebar underground stations and tunnels. Visit www.gov.sg/lta and www.ncc.se 33/02.Lum Chang Building Contractors Pte Ltd and Nishimatsu have won a S$321.6 million order for contract C823. The partners will build the Old Airport Road, Tanjong Katong and Paya Lebar underground stations and 3,300 m of bored tunnels. EPB shield machines to be used, outer diameter 6.63 m. Visit www.gov.sg/lta and www.nishimatsu.co.jp. C822 and C823 are part of Circle Line stage 2. Contract periods from 1st August, 2002 to 30th August, 2006. 33/02. The Land Transport Authority (LTA) has issued several open invitations to tender for the construction of tunnels and underground stations as part of Stage 3 of the Circle Line (CCL). Contract C852, deadline 28th April, 2003 is for the construction of Serangoon interchange station and associated tunnels between Bartley and Serangoon stations and between Serangoon and Lorong Chuan stations. Contract C853, deadline 21st April, 2003 is for the construction of Marymount station and associated tunnels between Lorong Chuan and Bishan stations and Bishan and Marymount stations. Contract C851A, deadline 16th April, 2003 is for the construction of Bartley station. Contract C852A, deadline 16th April, 2003 is for the construction of Lorong Chuan station. Contract C853A, deadline 25th April, 2003 is for the design and construction of Bishan interchange station. Contact Land Transport Authority, Projects & Engineering Office, Contracts & Process Division, Tenders Section, 1 Hampshire Road, Block 1, Singapore 219428. Contact Mr Kho Cheong Kiat, tel.+65 63961180 or Ms Low Bee Eng, tel. +65 63961202. E-mail bee_eng_low@lta.gov.sg. Tenders have already been invited for electrical services, tunnel ventilation and environmental control systems, and fire protection systems. Read E-News Weekly # 62.Stage 3 will extend the line from Upper Paya Lebar Road/Bartley Road to Marymount Road. This stretch with five underground stations is 5.7 km-long. Construction will start in the third quarter of 2003 to end in early 2008. Construction cost of about S$1.2 billion. The CCL is an orbital line linking all radial metro lines running into the city. It will run from Dhoby Ghaut to Paya Lebar, Serangoon, Bishan, Buona Vista and Harbour Front. Visit www.lta.gov.sg 10/03. The 12 prequalified tenderers for contract C852, which is the construction of Serangoon interchange station and associated tunnels between Bartley and Serangoon stations and between Serangoon and Lorong Chuan stations, are Econ / NCC International; Hyundai Engineering & Construction; Leighton; Nishimatsu; Obayashi; Penta-Ocean Construction; Samsung / Tiong Seng; Taisei; Tobishima / Wan Soon Construction; Woh Hup / Shanghai Tunnel Engineering / Alpine Mayreder; Züblin / Koh Brother Building & Civil Engineering; and Ssang Yong Engineering & Construction.The 11 prequalified candidates for contract C853, which is the construction of Marymount station and associated tunnels between Lorong Chuan and Bishan stations and Bishan and Marymount stations, are Greatearth Construction / United Engineers / Sato Kogyo; Hyundai Engineering & Construction; Leighton; Obayashi; Penta-Ocean Construction; Samsung; Taisei; Tobishima / Wan Soon Construction; Woh Hup / Shanghai Tunnel Engineering / Alpine Mayreder; Züblin / Koh Brother Building & Civil Engineering; and Ssang Yong Engineering and Construction. Visit www.lta.gov.sg 16/03. Contract C852A for construction of the Lorong Chuan station has been awarded to Sato Kogyo for S$65 million. The contract is part of Stage 3 of the Circle Line. The contract involves civil, structural, architectural, plumbing, drainage and reinstatement works for the station. More in E-News Weekly # 28/2003. Visit www.lta.gov.sg and www.satokogyo.com.sg 28/03.Prequalification, deadline 25th July, for civil construction of the stations and tunnels for Stages 4 and 5, contracts 854, 855 and 856. The internal diameter of the bored tunnels will be 5.8 m approximately. Contract 854 is for construction of 5.3 km of twin bored tunnels, 320 m of cut-and-cover tunnels, and three underground stations. Contract 855 is for construction of 4 km of twin bored tunnels, 350 m of cut-and-cover tunnels, civil works for three underground stations, and architectural and building services for another four stations. Contract 856 is for construction of 3.4 km of twin bored tunnels, 640 m of cut-and-cover tunnels, civil works for four underground stations, and architectural and building services for five more stations. Tunnelling using both slurry and EPB TBMs. Contact Land Transport Authority, Project & Engineering Office, Contracts & Process Division, Tenders Section, Section 1, Hampshire Road Block 1, Singapore 219428, Mr Kho Cheong Kiat, tel. +65 63961180 or Ms Low Bee Eng, tel. +65 63961202, e-mail bee_eng_low@lta.gov.sg. Visit www.gebiz.gov.sg 29/03.Civil works contract C852 for Stage 3 of the Circle Line (CCL), worth S$155.9 million, has been awarded to to the Woh Hup / Shanghai Tunnel Engineering Co. (STEC) / Alpine Mayreder JV. This contract involves the construction and completion of Serangoon interchange station, the interconnecting tunnels from Serangoon station to Lorong Chuan station, and from Serangoon station to Bartley station. Visit www.wohhup.com, www.stec.net and www.alpine.at 43/03.Contract C853 for the construction and completion of Marymount station including the tunnels between Lorong Chuan and Bishan stations and Bishan and Marymount stations has been awarded to Taisei Corporation for S$167.7 million. This contract involves the civil, structural, architectural, plumbing, drainage and reinstatement works for the station including the twin bored tunnels. Visit www.taisei.co.jp/english 43/03.Contract C851A for the construction of Bartley station has been awarded to Wan Soon Construction for S$63.5 million. This contract involves the civil, structural, architectural, plumbing, drainage and reinstatement works for the station. Visit www.wansoon.com.sg 43/03.Contract C853A for the design, construction and completion of Bishan interchange station has been awarded to a JV between Econ Corporation and Eng Lim Construction for S$82.2 million. This contract involves the civil, structural, architectural, plumbing, drainage and reinstatement works for the station. Visit www.econ.com.sg 43/03.Stage 3 of the CCL is 5.7 km-long with five stations, running from Bartley Road to Marymount Road, with interchange stations at Serangoon (with the North East Line) and Bishan (with the North-South Line). It will cost about S$1.2 billion to build. Visit www.lta.gov.sg 43/03.As part of Stages 4 and 5 of the CCL, the twelve prequalified applicants for contract C854 are Züblin / Koh Brothers; Gammon Skanska; Hyundai / Straits Construction; Leighton; Obayashi; Penta Ocean; Sato Kogyo / Greatearth Construction; Sembcorp; SsangYong; Taisei; Tobishima / Wan Soon; and Wayss & Freytag. Contract 854 comprises 5.3 km of 5.8 m-diameter twin bored tunnels, 320 m of cut-and-cover tunnels, and three underground stations. 43/03.The eleven prequalified proponents for contract C855 are Züblin / Koh Brothers; Hyundai / Straits Construction; NCC; Nishimatsu / Lum Chang; Obayashi; Samsung; Sato Kogyo / Greatearth Construction; Shimizu / United Engineer; Taisei; Tobishima / Wan Soon; and Woh Hup / Shanghai Tunnel Engineering Co. / Alpine Mayreder. Contract 855 comprises 4 km of 5.8 m-diameter twin bored tunnels, 350 m of cut-and-cover tunnels, civil works for three underground stations, and architectural and building services for another four stations. 43/03.The twelve prequalified candidates for contract C856 are Gammon Skanska; Leighton; NCC; Nishimatsu / Lum Chang; Obayashi / Sato Kogyo; Penta Ocean; Samsung; Sembcorp; Shimizu / United Engineer; SsangYong; Wayss & Freytag; and Woh Hup / Shanghai Tunnel Engineering Co. / Alpine Mayreder. Contract 856 comprises 3.4 km of 5.8 m-diameter twin bored tunnels, 640 m of cut-and-cover tunnels, civil works for four underground stations, and architectural and building services for five more stations. All bored tunnels to be driven using slurry and EPB TBMs. Visit www.lta.gov.sg 43/03.There have been changes in the prequalified JVs for Stages 4 and 5 of the Circle Line. There are now six prequalified applicants for contract C854 instead of 12 before. They are Zueblin / Koh Brothers / NCC; Hyundai / Straits Construction; Obayashi / Sato Kogyo / Greatearth Construction; Sembcorp; Taisei; and Tobishima / Wan Soon. Contract 854 comprises 5.3 km of 5.8 m-diameter twin bored tunnels, 320 m of cut-and-cover tunnels, and three underground stations. 17/04.There are now ten prequalified proponents for contract C855 instead of eleven. They are Zueblin / Koh Brothers / NCC; Hyundai / Straits Construction; Nishimatsu / Lum Chang; Obayashi; Sato Kogyo / Greatearth Construction; Shimizu / United Engineer; Taisei / Sembcorp; Tobishima / Wan Soon; Wayss and Freytag / China State Construction Engineering Corporation; and Woh Hup / Shanghai Tunnel Engineering Co. / Alpine Mayreder. Contract 855 comprises 4 km of 5.8 m-diameter twin bored tunnels, 350 m of cut-and-cover tunnels, civil works for three underground stations, and architectural and building services for another four stations. 17/04.The nine prequalified candidates for contract C856, instead of 12 previously, are Leighton; NCC; Nishimatsu / Lum Chang; Obayashi / Sato Kogyo; Penta Ocean; Shimizu / United Engineer; Taisei / Sembcorp ; Wayss & Freytag; and Woh Hup / Shanghai Tunnel Engineering Co. / Alpine Mayreder. Contract 856 comprises 3.4 km of 5.8 m-diameter twin bored tunnels, 640 m of cut-and-cover tunnels, civil works for four underground stations, and architectural and building services for five more stations. All bored tunnels to be driven using slurry and EPB TBMs. Visit www.lta.gov.sg 17/04.A Nishimatsu / Lum Chang JV has emerged as the lowest bidder for contract C855 as part of Stage 4 of the 33 km Circle Line. The contract is for the construction of the Holland, Buona Vista and National University Hospital stations, 4 km of 5.8 m-diameter twin bored tunnels and 350 m of cut-and-cover tunnels. Nishimatsu-Lum Chang's bids were between SGD376.4 million and SGD389 million. The next lowest bids, from the Woh Hup-Shanghai Tunnel Engineering Co.-Alpine Mayreder consortium, were between SGD391 million and SGD398 million. The other bids came from Obayashi (SGD400.3 million), SembCorp Engineers (between SGD399 million and SGD404 million) and a team formed by Shimizu and United Engineers (between SGD448.8 million and SGD452.6 million). If the lowest bid has the best chance of winning, because of the Nicoll Highway collapse, the authorities will take longer to deliberate on who should be given the job. Visit www.lta.gov.sg. Subscribe to E-News Weekly 22/2004. 23/04.Taisei put in the lowest bid to win a SGD391.6 million contract to build a section of stages 4 and 5 of the MRT Circle Line. Its bid was almost SGD30 million less than the next lowest. The contract is the first of three civil works contracts for the two stages of the underground Circle Line. It involves the building of Adam and Farrer stations, twin tunnels of 6.3 km each, provisions for future stations in Bukit Brown and Thomson Road, as well as the construction of commuter facilities. Visit www.lta.gov.sg and www.taisei.co.jp/english 30/04.A civil works contract, worth SGD399.9 million, for the construction and completion of Holland, Buona Vista and National University Hospital stations, including fit out works and tunnels for One-North station has been awarded to the Woh Hup / Shanghai Tunnel Engineering Co. / Alpine Mayreder JV, as part of Stages 4 and 5 of the Circle Line. This is the second of three civil works contracts to be awarded for these two stages. Visit www.lta.gov.sg 35/04.This JV already won contract C852 as part of Stage 3 and has purchased Black Diamond Cutters' single and twin 17 inch cutter assemblies for use on the two Herrenknecht TBMs for this project, with diameter 6.3 m on 2 x 3 km drives. Delivery is for October 2004. Visit www.blackdiamondcutters.com.au 35/04. SembCorp Engineers has clinched the final civil works contract for the Circle Line with the lowest bid of SGD335.4 million. The scope of work covers the construction of tunnels and four new stations at West Coast, Pasir Panjang, Alexandra and Telok Blangah as well as HarbourFront station fit out works. West Coast station has been earmarked as a future station as the area around it is not fully developed. Only structural provisions will be made at this station to facilitate future construction. The first stage of the line was supposed to be ready by 2007, but is likely to be delayed for at least a year because of the tragic collapse at the Nicoll Highway stretch of tunnels in April. Visit www.lta.gov.sg and www.sembcorpenc.com 42/04.The Land Transport Authority (LTA) has awarded the civil works contract 901 for the Circle Line (CCL) to Hock Lian Seng Infrastructure. The contract is valued at SGD348.4 million. Contract 901 is for the construction and completion of the Marina Bay station and tunnels. The scope of the contract also includes addition and alteration works to the existing North South Line (NSL) at Marina Bay station, diversions as well as demolition of an underpass. Visit www.hlsgroup.com.sg 10/08.The LTA also awarded contract 830A for the electrical and mechanical systems for the CCL to the consortium of Alstom Transport and Singapore Technologies Electronics. The contract is valued at approximately SGD106 million. Contract 830A covers the design, supply, delivery to site, installation, testing and commissioning of major electrical and mechanical systems, such as signalling system, platform screen doors, communications system, integrated supervisory control system, power supply system (high tension and traction power), trackworks and travel information system. Visit www.transport.alstom.com and www.stengg.com 10/08.



Permalink

Spain

Spain, Madrid - es/184

Road


Prior information notice for the power supply for public lighting, tunnels, ornamental hydraulic installations and service tunnels of the Madrid City Council. For tender documents please click here. Contact Area de Gobierno de Obras y Equipamientos, Madrid, email sgcontratacionobras@madrid.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=547196-2021. Ref. n. 300/2021/00704. 43/21. 

 

Spain-Madrid: Electricity

2021/S 209-547196

Notice on a buyer profile

This notice is related to following: Prior information notice

Supplies

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority/entity

I.1)Name and addresses
Official name: Área de Gobierno de Obras y Equipamientos
National registration number: P2807900B
Postal address: Alcalá, 45
Town: Madrid
NUTS code: ES300 Madrid
Postal code: 28014
Country: Spain
Contact person: Área de Gobierno de Obras y Equipamientos
E-mail: sgcontratacionobras@madrid.es
Internet address(es):
Main address: http://www.madrid.es
Address of the buyer profile: https://contrataciondelestado.es/wps/poc?uri=deeplink:perfilContratante&idBp=FzqTvj596R3nSoTX3z%2F7wA%3D%3D
I.3)Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at: https://contrataciondelestado.es/wps/poc?uri=deeplink:detalle_licitacion&idEvl=K31B2d7QhIEBPRBxZ4nJ%2Fg%3D%3D
I.4)Type of the contracting authority
Regional or local authority
I.5)Main activity
General public services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Contrato de suministro de energía eléctrica destinada al alumbrado público, túneles, instalaciones hidráulicas ornamentales y galerías de servicios del Ayuntamiento de Madrid

Reference number: 300/2021/00704
II.1.2)Main CPV code
09310000 Electricity
II.1.3)Type of contract
Supplies
II.2)Description
II.2.3)Place of performance
NUTS code: ES300 Madrid
II.2.4)Description of the procurement:

Contrato de suministro de energía eléctrica destinada al alumbrado público, túneles, instalaciones hidráulicas ornamentales y galerías de servicios del Ayuntamiento de Madrid

Section VI: Complementary information

VI.3)Additional information:
VI.5)Date of dispatch of this notice:
22/10/2021



Permalink

Spain, Galicia - es/172

Railway

Sistemas y Montajes Industriales secured the EUR65,706 contract, VAT included, for  the management of civil protection equipment in the four tunnels Vado Yeso (1,684 m), Gobantes (861 m), Gaitan/El Chorro (5,321 m) and Duran (469 m) on the Bobadilla-Malaga line. The aim of this work is to ensure power supply in the tunnels, located in the province of Malaga. Visit http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/D8EF03BE7AC9DF97C1257B80003A9A7B?Opendocument. 25/13.



Permalink

Spain, Madrid - es/104

M-30 Highway Upgrading

Extensive tunnelling (26 km) is planned to ease congestion on M-30 ring road in Madrid. A total of seven EPB shields will be needed. Six of these would be 15 to 16 m-diameter machines to drive three-lane tunnels namely the east and west tunnels, 3.5 km each, near the Manzanares river; the north and south tunnels, 4 km each, to bypass Avenida de la Ilustracií³n; and the north and south tunnels to bypass the south of the city, 3 km each. The seventh EPB shield would be a around 11 to 12 m in diameter to drive a two-lane 5 km tunnel to connect Avenida de la Ilustracií³n to N-I. Read E-News Weekly 23/2003. 32/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing the undergrounding of road N-V, section between the N-V interchange and M-30 in Sepulveda Street. Tender budget: €1.1 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=139594-2003, OJ S 153, or contact Ayuntamiento de Madrid, tel. +34 915883570. 37/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing the undergrounding of the M-30 highway and N-V trunk road in Madrid. Tender value: €1.55 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=140603-2003, OJ S 154, or contact City Hall, Madrid, tel. +34 915883570. 37/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing the right carriageway on the connection between Paseo Santa Marí­a de la Cabeza and trunk road N-III in Madrid on the M-30 south bypass. Tender value: €997,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=140539-2003, OJ S 154, or contact City Hall, Madrid, tel. +34 915883570. 37/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing the left carriageway on the connection between Paseo Santa Marí­a de la Cabeza and trunk road N-III in Madrid on the M-30 south bypass. Tender budget: €997,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=140546-2003, OJ S 154, or contact Ayuntamiento de Madrid, tel. +34 915883570. 37/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing the upgrading of the M-30, section from N-V to Castilla Road, west tunnel. Tender budget: €946,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=140547-2003, OJ S 154, or contact City Hall, Madrid, tel. +34 915883570. 37/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing designing the upgrading of the M-30, section from N-V to Castilla Road, east tunnel. Tender budget: €976,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=140619-2003, OJ S 154, or contact City Hall, Madrid, tel. +34 915883570. 37/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing the new tunel in Pí­o XII Avenue. Tender budget: €1 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=140544-2003, OJ S 154, or contact City Hall, Madrid, tel. +34 915883570. 37/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing the Ilustracií³n Avenue bypass, south tunnel. Tender budget: €1.2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=140543-2003, OJ S 154, or contact City Hall, Madrid, tel. +34 915883570. 37/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing the Ilustracií³n Avenue bypass, north tunnel. Tender budget: €1.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=140538-2003, OJ S 154, or contact City Hall, Madrid, tel. +34 915883570. 37/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing the undergrounding of section from Portugal Avenue to San Vicente roundabout. Tender budget: €1.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=140535-2003, OJ S 154, or contact City Hall, Madrid, tel. +34 915883570. 37/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing the extension to the O'Donnell Street tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=143623-2003, OJ S 157, or contact City Hall, Madrid, tel. +34 915883570. More information in E-News Weekly 23/2003. 37/03.Open invitation to tender, deadline 12th November, 2003, for design of specifications, tender documents, work supervision and supply of TBMs to be used for the modernisation of the M-30 motorway in Madrid. Six EPB shield machines will be necessary. Tender value: €241.4 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=168631-2003, OJ S 187, or contact City of Madrid, tel. +34 915883570. 41/03.Open call for bids, deadline 12th November, 2003 for design of the connection between Avenida de la Ilustracií³n and Avenida de Ventisquero de la Condesa, with a tunnel under Cardenal Herrera Oria and Fermí­n Caballero avenues. This is part of the upgrading of the M-30. Tender budget: €553,450. Contact http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=168628-2003, OJ S 187, or contact City of Madrid, tel. 34 915883570. 42/03.Open call for bids, deadline 12th November, 2003 for design of connection between the M-30 and N-III (motorway to Valencia). The project will consist in the building of two tunnels, one northbound to connect the Valencia motorway with the M-30 and one southbound. The tunnel will cross Plaza de Conde de Casal and Hermanos Ferní¡ndez Shaw street, which will reduce traffic jams in the area. Tender budget: €837,930. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=168576-2003, OJ S 187, or contact City of Madrid, tel. 34 915883570. 42/03.Two preinformation notices for construction of two tunnels (2,700 m and 2,800 m), and their cross passages, between Praga Bridge and the N-III connection to Valencia. Each tunnel with three 3.5 m-wide lanes plus pavements. Excavation with EPB shields, 15.2 m in diameter. Total thrust: 30,000 tons (300,000 kN). Cutterhead torque: 12,500 mt (125,000 kNm) and minimum installed power of 10,000 kW. Machine with one or two screw conveyors. Double segment erector capable to install the ring in 15 minutes. Estimated cost: €120 to €170 million for each tunnel. Work start in June 2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=193992-2003, OJ S 216, and http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=194804-2003, OJ S 217, or contact City of Madrid, tel. +34 915883439 or 3396. 47/03.Preinformation notice for construction of a 3.5 km tunnel for two carriageways, three 3.5 m-wide lanes for each carriageway, for putting underground the N-V between Aluche and Sepulveda Street. Cut-and-cover method. Estimated cost: €212 to €250 million. Work start in June 2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=194805-2003, OJ S 217, or contact City of Madrid, tel. +34 915883439 or 3396. 47/03.Two preinformation notices for construction of two tunnels, 4.5 km each, and their cross passages, to link Maella Roundabout and La Paloma Interchange. Each tunnel with three 3.5 m-wide lanes plus pavements. Excavation with EPB shields, 15.2 m in diameter. Total thrust: 30,000 tons (300,000 kN). Cutterhead torque: 12,500 mt (125,000 kNm) and minimum installed power of 10,000 kW. Machine with one or two screw conveyors. Double segment erector capable to install the ring in 15 minutes. Estimated cost: €210 to €270 million for each tunnel. Work start in June 2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=193995-2003 and http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=193997-2003, OJ S 216, or contact City of Madrid, tel. +34 915883439 or 3396. 47/03.Preinformation notice for construction of a 3 km tunnel for two carriageways, five 3.5 m-wide lanes for each carriageway, for putting underground the M-30 between Toledo Bridge and the South Interchange. Cut-and-cover method. Estimated cost: €325 to €350 million. Work start in June 2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=193996-2003, OJ S 216, or contact City of Madrid, tel. +34 915883439 or 3396. 47/03.Preinformation notice for construction of a 1.5 km tunnel for two carriageways, three 3.5 m-wide lanes for each carriageway, for putting underground the N-V between Sepulveda Street and Toledo Bridge. Cut-and-cover method. Estimated cost: €225 to €260 million. Work start in June 2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=194005-2003, OJ S 216, or contact City of Madrid, tel. +34 915883439 or 3396. 47/03.Preinformation notice for construction of two tunnels, 3.4 km each, for putting underground the M-30 between El Rey Bridge and Toledo Bridge. Carriageway to accomodate five 3.5 m-wide lanes. Estimated cost: €300 to €350 million. Work start in June 2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=194010-2003, OJ S 216, or contact City of Madrid, tel. +34 915883439 or 3396. 47/03.Preinformation notice for construction of two tunnels, 2.5 km each, and their cross passages, to connect Ilustracií³n Avenue with the N-I. Each tunnel with three 3.5 m-wide lanes plus pavements. Excavation with EPB shields, 15.2 m in diameter. Total thrust: 30,000 tons (300,000 kN). Cutterhead torque: 12,500 mt (125,000 kNm) and minimum installed power of 10,000 kW. Machine with one or two screw conveyors. Double segment erector capable to install the ring in 15 minutes. Estimated cost: €200 to €250 million. Work start in June 2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=194011-2003, OJ S 216, or contact City of Madrid, tel. +34 915883439 or 3396. 47/03.Preinformation notice for 800 m extension to the O'Donnell tunnel in Madrid under Doctor Esquerdo Street, with two 3 m-wide lanes plus pavements. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220541-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Preinformation notice for sinking underground Avenida de Portugal up to San Vicente Roundabout (1,750 m). This will ease connection between Casa de Campo and Distrito de Latina. Access to the San Vicente Roundabout will be in tunnel and tunnels will also allow for coaches to access to the Prí­ncipe Pí­o Interchange. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220556-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Preinformation notice for upgrading the connection between the M-30 (La Paloma Interchange) and Pí­o XII Street and Avenida de Burgos. A 800 m tunnel will be constructed to link up Paseo de la Castellana - Chamartí­n to M-30 and slip roads to Avenida de Burgos - Pí­o XII. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220559-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Preinformation notice for construction of a 1,100 m two-way cut-and-cover tunnel beneath San Aquilino Street up to the vicinity of the Ciudad Deportiva del Real Madrid. From there, the tunnel will separate in two branches (one for each direction) to connect with the bus lane of Colmenar Road and N-I. The tunnel of each branch will be TBM-driven and cross-connected. Their cross section will be sufficient to permit traffic of two coaches thereby avoiding traffic interruption in case of breakdown in one of them. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220586-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Preinformation notice for upgrading the interchange between N-100 - O'Donnell and M-30. Two underpasses will be constructed, the first being 720 m in length under the M-30 north and the second, 920 m in length, under the M-30 south. Each will accomodate two 3.5 m-wide lanes plus pavements. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220588-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Preinformation notice for upgrading the interchange between M-30 and Avenida de América / N-II. Two underpasses will be constructed to connect N-II / M-30 south and M-30 north / N-II. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220589-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Preinformation notice for construction of an underpass under Plaza José Marí­a Soler to channel traffic from M-30 north, M-30 south, Gran Ví­a de Hortaleza and Costa Rica. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220590-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Preinformation notice for construction of a new 900 m-long three-lane cut-and-cover tunnel to connect Paseo de la Castellana with Pí­o XII Street. The existing tunnel will be renovated for one-way traffic. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220592-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Preinformation notice for construction of a subterranean distributor at Ciudad Deportiva del Real Madrid. Cut-and-cover method. There will be two traffic levels and four lanes. Length: 1.2 km, depth: 20 m. The new distributor will connect with the existing roadway and the new one, making possible access by public transport and improving north/south and east/west traffic. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220593-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Preinformation notice for connecting Avenida de la Ilustracií³n with Ventisquero de la Condesa Street. The project requires the construction of a connection between El Pilar and M-40 through Ventisquero de la Condesa Street, by means of a 600 m tunnel beneath Avenida del Cardenal Herrera Oria. Three underground car parks will also be built to replace the existing ones that will be affected by the works. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220594-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Preinformation notice for construction of two underpasses under the M-30 to connect directly M-30 north with N-III and N-III with M-30 south. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220595-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Open invitation to tender, deadline 19th July, 2004 for extension of the O'Donnell tunnel. The extension of the O'Donnell tunnel will span 783 m. From late 2005 or early 2006, the lengthened tunnel will start from Menendez Pelayo street, while it now starts in Puerta de la Maternidad, to cross under Doctor Esquerdo up to Piruli. Tender budget: EUR21.8 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=100261-2004, OJ S 119, or contact City Hall, Madrid, fax +34 915883571 or tel. +34 915883570. Subscribe to E-News Weekly 26/2004. 27/04.Open invitation to tender, deadline 30th July, 2004 for work inspection, monitoring and health and safety coordination as part of the O'Donnell tunnel extension. Tender budget: EUR25,400. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=096846-2004, OJ S 115, or contact City Hall, Madrid, tel. +34 915883475 or 915883570. Subscribe to E-News Weekly 26/2004. 27/04.Open invitation to tender, deadline 19th July, 2004 for construction of a new tunnel in Pio XII Avenue. The new 823 m-long three-lane tunnel will run parallel to the existing Pio XII tunnel. Its cost amounts to EUR37 million. Time frame for construction: 30 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=100267-2004, OJ S 119, or contact City Hall, Madrid, fax +34 915883571 or tel. +34 915883653. Subscribe to E-News Weekly 26/2004. 27/04.Open call for bids, deadline 23rd July, 2004 for construction of the right carriageway on the Paseo de Santa Maria de la Cabeza / N-III connection, corresponding to the south tunnel of the M-30 south bypass. This 8,344 m section requires 7,212 m of three-lane bored tunnel and 632 m of cut-and-cover tunnel. Tender value: EUR370 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=103872-2004, OJ S 123, or contact Empresa Municipal Madrid Calle 30, Madrid, fax +34 91 5883139. 28/04.Open call for bids, deadline 23rd July, 2004 for construction of the left carriageway on the Paseo de Santa Maria de la Cabeza / N-III connection, corresponding to the north tunnel of the M-30 south bypass. This 8,344 m section requires 7,212 m of three-lane bored tunnel and 632 m of cut-and-cover tunnel. Tender value: EUR292.5 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=103849-2004, OJ S 123, or contact Empresa Municipal Madrid Calle 30, Madrid, fax +34 91 5883139. 28/04.Open call for bids, deadline 12th August, 2004 for quality control during construction of the left carriageway on the Paseo de Santa Maria de la Cabeza / N-III connection, corresponding to the north tunnel of the M-30 south bypass. Tender value: EUR2.9 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=104964-2004, OJ S 123, or contact Empresa Municipal Madrid Calle 30, Madrid, fax +34 91 5883139. 28/04.Open call for bids, deadline 23rd July, 2004 for construction of an interchange between La Paloma and Pio XII Street / Avenida de Burgos. This 5,508 m section requires a 1,546 m cut-and-cover tunnel and 175 m with conventional means. Tender value: EUR47.8 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=103855-2004, OJ S 123, or contact Empresa Municipal Madrid Calle 30, Madrid, fax +34 91 5883139. 28/04.Open call for bids, deadline 12th August, 2004 for quality control throughout construction of an interchange between La Paloma and Pio XII Street / Avenida de Burgos. Tender value: EUR478,450. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=104988-2004, OJ S 123, or contact Empresa Municipal Madrid Calle 30, Madrid, fax +34 91 5883139. 28/04.Open call for bids, deadline 23rd July, 2004 for upgrading of the interchange between the M-30 and N-III. This 4.8 km section requires a 1.4 km cut-and-cover tunnel and 430 m with conventional means. Tender value: EUR161.2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=103833-2004, OJ S 123, or contact Empresa Municipal Madrid Calle 30, Madrid, fax +34 91 5883139. 28/04.Open call for bids, deadline 12th August, 2004 for quality control during upgrading of the interchange between the M-30 and N-III. Tender value: EUR1.6 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=104963-2004, OJ S 123, or contact Empresa Municipal Madrid Calle 30, Madrid, fax +34 91 5883139. 28/04.Open call for bids, deadline 23rd July, 2004 for upgrading of the interchange between Costa Rica Street and Plaza Jose Maria Soler and the slip roads to the M-30. This 2,078 m section requires 892 m of cut-and-cover tunnel. Tender value: EUR23.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=103850-2004, OJ S 123, or contact Empresa Municipal Madrid Calle 30, Madrid, fax +34 91 5883139. 28/04.Open call for bids, deadline 12th August, 2004 for quality control throughout the upgrading works of the Costa Rica Street and Plaza Jose Maria Soler and the slip roads to the M-30. Tender value: EUR232,750. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=105021-2004, OJ S 123, or contact Empresa Municipal Madrid Calle 30, Madrid, fax +34 91 5883139. 28/04.More tenders in E-News Weekly 28/2004. Also read E-News Weekly 23/2003. 28/04.Open invitation to tender, deadline 17th August, 2004 for inspection, monitoring and health and safety coordination during construction of the interchanges between M-30 and Avenida de América / A-2 and between N-100-O'Donnell and M-30. Two underpasses will be constructed to connect N-II / M-30 south and M-30 north / N-II. The interchange between N-100-O'Donnell and M-30 requires two underpasses, 720 m under the M-30 north and 920 m under the M-30 south, each accomodating two 3.5 m-wide lanes. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=107776-2004, OJ S 127, or contact Madrid Calle 30, Madrid, fax +34 915883139. 29/04.Open call for bids, deadline 17th August, 2004 for inspection, monitoring and health and safety coordination during construction of the left carriageway on the Paseo de Santa Maria de la Cabeza / M-30 connection, corresponding to the north tunnel of the south bypass. This 8,344 m section requires 7,212 m of three-lane bored tunnel and 632 m of cut-and-cover tunnel, divided in two separate tubes. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=107697-2004, OJ S 127, or contact Madrid Calle 30, Madrid, fax +34 91 5883139. 29/04.Open call for bids, deadline 17th August, 2004 for inspection, monitoring and health and safety coordination during construction of the interchange between the M-30 and N-III. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=107672-2004, OJ S 127, or contact Madrid Calle 30, Madrid, fax +34 91 5883139. 29/04.Open call for bids, deadline 17th August, 2004 for inspection, monitoring and health and safety coordination during construction of an interchange between La Paloma and Pio XII Street / Avenida de Burgos and upgrading of the interchange between Costa Rica Street and Plaza Jose Maria Soler and the slip roads to the M-30. The first scheme is 5,508 m in length and requires a 1,546 m cut-and-cover tunnel and 175 m with conventional means. The second is a 2,078 m section including a 892 m of cut-and-cover tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=107788-2004, OJ S 127, or contact Madrid Calle 30, Madrid, fax +34 91 5883139. 29/04.Open call for bids, deadline 12th August, 2004 for quality control during construction of the right carriageway on the Paseo de Santa Maria de la Cabeza / N-III connection, corresponding to the south tunnel of the M-30 south bypass. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=108659-2004, OJ S 128, or contact Madrid Calle 30, Madrid, fax +34 91 5883139. 29/04.Open call for bids, deadline 17th August, 2004 for inspection, monitoring and health and safety coordination during construction of the right carriageway on the Paseo de Santa Maria de la Cabeza / M-30 connection, corresponding to the south tunnel of the south bypass. This 8,344 m section requires 7,212 m of three-lane bored tunnel and 632 m of cut-and-cover tunnel, divided in two separate tubes. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=117419-2004, OJ S 137, or contact Madrid Calle 30, Madrid, fax +34 915883139. 31-32/04.Open call for bids, deadline 20th September, 2004 for inspection, monitoring and health and safety coordination during construction of the connection between Tetuan district and the M-30, section Sor Angela de la Cruz-Marques de Viana, including a 1.284 m tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=131107-2004, OJ S 151, or contact City of Madrid, Madrid, tel. +34 915883475 or 3653. 35/04.Open call for bids, deadline 20th September, 2004 for inspection, monitoring and health and safety coordination during construction of a new 823 m tunnel in Pio XII Avenue. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=131101-2004, OJ S 151, or contact City of Madrid, Madrid, tel. +34 915883475 or 3653. 35/04.Municipal agency Madrid Calle 30 has awarded to Necso and Ferrovial Agroman the construction of the north tunnel on the south bypass. The contract is worth EUR331.4 million. Visit www.necso.es and www.ferrovial.es 37/04.The south tunnel on the south bypass will be constructed by a JV beween FCC and ACS Dragados for EUR410.3 million. Visit www.fcc.es and www.grupoacs.com 37/04.The south bypass is a three-lane infrastructure totalling 8,344 m divided in two tunnels, of which 7,212 m to be built by 15 m-diameter TBMs and 632 m in cut-and-cover. Sinking of the shafts for the TBMs starts immediately. Construction will last 30 months. Both tunnels, one in each direction, of the so-called south bypass, will allow drivers to avoid the A-3 connection. 37/04.Sacyr Vallehermoso will build for EUR170.7 million and in 24 months the improvements of the connection to the A-3. This is a 4.8 km section, whereof 1.4 km in cut-and-cover and 430 m using conventional means. Visit www.gruposyv.com 37/04.Corsan-Corviam is to improve for EUR50 million La Paloma Interchange. The 5,508 m section requires to excavate 1,546 m in cut-and-cover and 175 m using conventional means. Visit www.corsan-corviam.es 37/04.Another JV set up by Construcciones Sando and Ploder will build the connections to Costa Rica and Jose Maria Soler in 14 months at a cost of EUR24.3 million. This section is 2,078 m in length and includes 892 m of cut-and-cover tunnel. Visit www.sando.net and www.ploder.es 37/04.Aldesa Construcciones has been selected to modernise in 14.5 months the connection with Avenida de América for EUR23 million. Two underpasses are needed to link up the N-II with the M-30 south and the M-30 north with the N-II. Visit www.aldesaconstrucciones.es 37/04.Construction is to start simultaneously on all the sections from September 2004 to conclude between November 2005 and spring 2007. Visit www.urbanismo.munimadrid.es/ 37/04.Comsa will build the extension of the O'Donnell tunnel in Madrid, for EUR25.3 million and a time frame of 18 months. The existing O'Donnell avoids to cross at grade Doctor Esquerdo street and is one of the main ways to get out of Madrid. The existing tunnel, 500 m in length, will be lengthened to 1.3 km and its new entrance will be located near Retiro Park. The cut-and-cover method will be used. Visit www.comsa.com 42/04.Open call for tenders, deadline 9th December, 2004 for construction of a 2 x 700 m tunnel linking Ilustracion and Ventisquero de la Condesa avenues. Each bore will carry two 3.5 m-wide lanes. Cut-and-cover and Belgian tunnelling methods. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=187466-2004, OJ S 218, or contact Ayuntamiento de Madrid, Madrid, fax +34 915883571. 47/04.Open call for tenders, deadline 4th January, 2005 for construction of a tunnel with entrances and exits in Embajadores Street, El Planetario Avenue and the M-30 / M-40 bypass to permit direct connection with the A-4 and all M-40's movements. In addition, there are two junctions (entry and exit) to link the M-30 with the south end of Embajadores Street. The total length is 5.8 km, whereof 2,460 m of cut-and-cover tunnel. Estimated cost: EUR143.8 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=203999-2004, OJ S 237, or contact Madrid Calle 30, Madrid, fax +34 917213265. E-mail madridcalle30juridic@munimadrid.es. Subscribe to E-News Weekly 47/2004. 51-52/04.Open call for tenders, deadline 19th January, 2005 for inspection, monitoring and safety and health coordination throughout construction of the connection between Embajadores Street and the M-40. Estimated cost: EUR2.8 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=203301-2004, OJ S 236, or contact Madrid Calle 30, Madrid, fax +34 917213265. E-mail madridcalle30juridic@munimadrid.es 51-52/04.Open call for tenders, deadline 19th January, 2005 for quality control throughout construction of the connection between Embajadores Street and the M-40. Estimated cost: EUR1.4 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=203312-2004, OJ S 236, or contact Madrid Calle 30, Madrid, fax +34 917213265. E-mail madridcalle30juridic@munimadrid.es 51-52/04.Open call for tenders, deadline 9th March, 2005 for sinking underground the Rey Bridge-Portugal Avenue interchange between Paseo del Marques de Monistrol and Segovia Bridge. The northbound inner carriageway is 2,887.5 m in length while the southbound outer carriageway has a length of 2,910.6 m. It is a cut-and-cover tunnel. Estimated cost: EUR403.7 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=014886-2005, OJ S 16, or contact Madrid Calle 30, Madrid, fax +34 917213265. E-mail madridcalle30juridic@munimadrid.es. Also visit www.madridcamina.org/GruposTrabajo/M-30/Proyectos/Monistrol-Pte%20Segovia/Monistrol-Pte%20Segovia-Memoria.pdf to read a technical report on the project.Open call for tenders, deadline 9th March, 2005 for sinking underground the M-30 between Segovia Bridge and San Isidro Bridge (2.5 km). The route totals 5,797.9 m, whereof 2,887.5 m for the inner carriageway and 2,910.4 m for the outer carriageway. Also a 622.5 m stretch of the A-5 will be sunk underground. It is a cut-and-cover tunnel. Estimated cost: EUR264.8 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=014888-2005, OJ S 16, or contact Madrid Calle 30, Madrid, fax +34 917213265. E-mail madridcalle30juridic@munimadrid.es. Also visit www.madridcamina.org/GruposTrabajo/M-30/Proyectos/PteSegovia-SanIsidro/Pte%20segovia-San%20Isidro-Memoria.pdf to read a technical report on the project. 05/05.Open call for tenders, deadline 14th March, 2005 for inspection, monitoring and safety and health coordination during construction of the M-30 cut-and-cover tunnel between Segovia Bridge and San Isidro Bridge (2.5 km). Estimated cost: EUR4.5 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=018719-2005, OJ S 19, or contact Madrid Calle 30, Madrid, fax +34 917213265. E-mail madridcalle30juridic@munimadrid.es. 05/05.Open call for tenders, deadline 9th March, 2005 for sinking underground the M-30 between San Isidro Bridge and Praga Bridge. The inner carriageway spans 1,404.76 m while the outer carriageway spans 1,397.36 m. It is a cut-and-cover tunnel. Estimated cost: EUR242.4 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=014894-2005, OJ S 16, or contact Madrid Calle 30, Madrid, fax +34 917213265. E-mail madridcalle30juridic@munimadrid.es. Also visit www.madridcamina.org/GruposTrabajo/M-30/Proyectos/San%20Isidro-Praga/San%20Isidro-Praga-Memoria.pdf to read a technical report on the project. 05/05.Open call for tenders, deadline 9th March, 2005 for sinking underground the M-30 between Praga Bridge and the south interchange. The inner carriageway is 1,940.73 m long and the outer carriageway is 1,914.50 m long. It is a cut-and-cover tunnel. Estimated cost: EUR246.7 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=014885-2005, OJ S 16, or contact Madrid Calle 30, Madrid, fax +34 917213265. E-mail madridcalle30juridic@munimadrid.es. Also visit www.madridcamina.org/GruposTrabajo/M-30/Proyectos/Pte%20Praga-Nudo%20Sur/Pte%20Praga-NudoSur-Memoria.pdf to read a technical report on the project. 05/05.Open call for tenders, deadline 9th March, 2005 for sinking underground Portugal Avenue between Paseo de Extremadura and the M-30. It is a 1,305 m cut-and-cover tunnel to carry two carriageways, each with four 3.5 m-wide lanes, 0.75 m-wide shoulders and 1 m-wide pavements. The three-lane access ramps to the cut-and-cover tunnel also carry a single-lane exit tunnel to Parque de Atracciones and Casa de Campo (642.3 m) and an entrance tunnel from Paseo de Extremadura and downtown Madrid (490.8 m). Estimated cost: EUR176.9 million. E-mail madridcalle30juridic@munimadrid.es. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=014890-2005, OJ S 16, or contact Madrid Calle 30, Madrid, fax +34 917213265. Also visit www.madridcamina.org/GruposTrabajo/M-30/Proyectos/Avda%20Portugal/Avda%20portugal-Memoria.pdf to read a technical report on the project. 05/05.Open call for tenders, deadline 14th March, 2005 for inspection, monitoring and safety and health coordination during construction of the Portugal Avenue cut-and-cover tunnel between Paseo de Extremadura and the M-30. Estimated cost: EUR3.6 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=018716-2005, OJ S 19, or contact Madrid Calle 30, Madrid, fax +34 917213265. E-mail madridcalle30juridic@munimadrid.es. 05/05.Open call for bids, deadline 11th April, 2005 for construction of the Ciudad Deportiva underground distributor. It is an undergound distributor ring under the former sport precinct of the Real Madrid, which consists of a rectangular road link, approximately 1,100 m in length, with three traffic lanes, as well as a lane to access to the future car parks. This ring will include five accesses to channel traffic from the M-30 west and south, the M-607 to Colmenar, Sinesio Delgado street, Monforte de Lemos and Pio XII avenues, the north and south sectors of Paseo de la Castellana, the A-1 Madrid-Burgos and the M-11. The project also includes a tunnel specially designed to channel public transport traffic with the A-1 and M-607. This tunnel will carry two lanes, one for each direction, running under Monforte de Lemos and Sinesio Delgado until Paseo de la Castellana, where it will branch off in two separate tunnels, one towards Plaza de Castilla and the other to Chamartin station. Construction will presumably commence in the middle of the year and last 30 months. Tender estimate: EUR106.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=037270-2005, OJ S 39, or contact City of Madrid, tel. +34 915883570 / 71 or 915883475. 09/05.Geoteyco and Eurocontrol secured a EUR2.8 million contract for quality control throughout construction of the right carriageway on the Paseo de Santa Maria de la Cabeza / N-III connection, corresponding to the south tunnel of the M-30 south bypass. Visit www.geoteyco.es and www.eurocontrol.es 10/05.A EUR3.5 million contract has been awarded to Intemac and Ginprosa for inspection, monitoring and health and safety coordination during construction of the left carriageway on the Paseo de Santa Maria de la Cabeza / M-30 connection, corresponding to the north tunnel of the south bypass. Visit www.intemac.es 10/05.Eptisa and Euroestudios secured a EUR2.4 million contract for quality control during construction of the left carriageway on the Paseo de Santa Maria de la Cabeza / N-III connection, corresponding to the north tunnel of the M-30 south bypass. Visit www.eptisainternacional.es and www.euroestudios.es 10/05.Aepo and Iberinsa secured a EUR3.3 million contract for inspection, monitoring and health and safety coordination during construction of the left carriageway on the Paseo de Santa Maria de la Cabeza / M-30 connection, corresponding to the south tunnel of the south bypass. Visit www.aepo.es and www.iberinsa.es 10/05.Euroconsult secured a EUR1.3 million contract for quality control during construction of the interchange between the M-30 and N-III. Visit www.euroconsult.es 10/05.Typsa and Ausurinsa secured a EUR2.4 million for inspection, monitoring and health and safety coordination during construction of the interchange between the M-30 and N-III. Visit www.typsa.es and www.asurinsa.com 10/05.Eurocontrol and Icaes secured a EUR185,500 for quality control throughout the upgrading works of the Costa Rica Street and Plaza Jose Maria Soler and the slip roads to the M-30. Visit www.eurocontrol.es and www.icaes.es 10/05.Inocsa secured a EUR1.9 million for inspection, monitoring and health and safety coordination during construction of an interchange between La Paloma and Pio XII Street / Avenida de Burgos and upgrading of the interchange between Costa Rica Street and Plaza Jose Maria Soler and the slip roads to the M-30. Visit www.inocsa.es 10/05.Proser secured a EUR1.7 million contract for inspection, monitoring and health and safety coordination during construction of the interchange between M-30 and Avenida de America / A-2 and between N-100-O'Donnell and M-30. Visit www.proser.es 10/05.Geocisa secured a EUR421,000 contract for quality control throughout construction of an interchange between La Paloma and Pio XII Street / Avenida de Burgos. Visit www.geocisa.com 10/05.Open call for bids, deadline 28th April, 2005 for inspection, monitoring as well as health and safety coordination during construction of the Ciudad Deportiva underground distributor. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=049285-2005, OJ S 51, or contact Ayuntamiento de Madrid, Madrid, tel. +34 915883475 or 915883570. Click es/104. 12/05.The City of Madrid has awarded to Sacyr a 24-month contract to build the tunnel which will connect Tetuan district with the M-30, for EUR69.15 million. The 1.35 km tunnel will start at Sor Angela de la Sor street, at the intersection between Infante Mercedes and Bravo Murillo streets to then cross the latter at great depth to avoid affecting Line 1 of the metro. Then, the tunnel passes beneath Marques de Vina street and Agustin Rodriguez Sahagun Park to end at the crossroads with Camino del Chorrillo. It is a 16 m-wide tunnel to be built using slurry walls. In addition to the tunnel, the contract also includes the construction of three car parks, with decks above or below the new roadway. Visit www.gruposyv.com 13/05.The City of Madrid has shared between six contractors contracts worth EUR1,245 million to put underground the six kilometres of the west section of the M-30 and 1.3 km on Avenida de Portugal. Work will commence in April and last 24 months.Sacyr secured a EUR166.3 million for the undergrounding of Avenida de Portugal between Paseo de Extremadura and the M-30. A 1,305 m-long cut-and-cover tunnel for a dual carriageway, a single-lane exit tunnel to Parque de Atracciones and Casa de Campo (642.3 m) and an entrance tunnel from Paseo de Extremadura and downtown Madrid (490.8 m) will be built. Visit www.sacyr.com 14/05.Dragados will underground the Rey Bridge-Avenida de Portugal interchange between Paseo del Marques de Monistrol and Segovia Bridge. The northbound inner carriageway is 2,887.5 m in length while the southbound outer carriageway has a length of 2,910.6 m. The contract is worth EUR371.7 million. Visit www.grupoacs.com 14/05.Ferrovial-Agroman and Compania de Obras Castillejos will underground the M-30 between Segovia Bridge and San Isidro Bridge (2.5 km). The route totals 5,797.9 m, whereof 2,887.5 m for the inner carriageway and 2,910.4 m for the outer carriageway. Also a 622.5 m stretch of the A-5 will be sunk underground. The contract totals EUR247.3 million. Visit www.ferrovial.com and www.madridcamina.org/GruposTrabajo/M-30/Proyectos/PteSegovia-SanIsidro/Pte%20segovia-San%20Isidro-Memoria.pdf 14/05.Necso will take underground the M-30 between San Isidro Bridge and Praga Bridge. The inner carriageway spans 1,404.76 m while the outer carriageway spans 1,397.36 m. The length of the entrance and exit interchanges is 3,560.72 m. The dualling of the main tunnel under Toledo Bridge is 955.97 m. Contract value: EUR227.8 million. Visit www.necso.es and www.madridcamina.org/GruposTrabajo/M-30/Proyectos/San%20Isidro-Praga/San%20Isidro-Praga-Memoria.pdf 14/05.FCC will sink underground the M-30 between Praga Bridge and the south interchange. The inner carriageway is 1,940.73 m long and the outer carriageway is 1,914.50 m long. The length of the entrance and exit interchanges is 3,795 m. The dualling of the main tunnels for integration in the south bypass is 1,182 m. Contract value: EUR231.8 million. Visit www.fcc.es and www.madridcamina.org/GruposTrabajo/M-30/Proyectos/Pte%20Praga-Nudo%20Sur/Pte%20Praga-NudoSur-Memoria.pdf 14/05.The City of Madrid has awarded to OHL the construction of a traffic disbributor tunnel under the four towers under construction on the site of what was before the Real Madrid sporting area. The project is budgeted at EUR114.2 million. OHL will build in 30 months the main tunnel, which will consist of a rectangle connected to 12 secondary tunnels for entries, exits and public transport usage. Five entries are planned, with one more envisaged in the future, and five exits together with a branch for public transport. The main tunnel is 1.1 km in length, with 450 m-long sections on the longest sides of the rectangle, orientated to the north-south direction almost parallel to Paseo de la Castellana. They will carry three lanes and a merging lane while the two shortest sides of this rectangle road will accommodate a unique lane. In addition, a four-lane perpendicular carriageway will cross the distributor (two lanes per direction), with access to the car park. Visit www.ohl.es 30/05.AEPO, Sener and Iberinsa secured a EUR2.9 million contract for inspection, monitoring and safety and health coordination during construction of the Portugal Avenue cut-and-cover tunnel between Paseo de Extremadura and the M-30. Visit www.aepo.es, www.sener.es and www.iberinsa.es 44/05.Ingenierí­a Bí¡sica and Incoydesa secured a EUR3.4 million contract for inspection, monitoring and safety and health coordination during the undergrounding of the M-30 between Segovia Bridge and San Isidro Bridge (2.5 km). Visit www.incoydesa.com 44/05.



Permalink

Spain, Gijí³n - es/73

Railway

    Award to Geocontrol of $120,000, six-month contract for geological investigation for underground railway line. Visit www.boe.es 15/01. East-west metrotren project defined by the Ministry of Development will include two parallel tunnels, 3 km-long, 6-7 m-wide, 20 m-deep, from Barrio de Moreda to La Guí­a. Geological studies by Geocontrol. Cost is US$132.3 million. 47/01. Open call for bids, deadline 10th February, 2003 for construction of the infrastructure and track of the cross city tunnel in Gijí³n. There will be a 3,538 m-long double-track tunnel running from the existing station in El Humedal to the Viesques roundabout. Inner diameter 9.6 m. Depth of -20 m.There will also be three stations in Begoí±a, El Bibio and Viesques. The Begoí±a station will consist of two big caverns: the station cavern, 162 m in length with a 20.3 x 16.8 m outer vaulted section, and the ticketing hall cavern, 65 m in length, featuring a 18.5 x 20.3 m outer vaulted section. This station will be mined. The El Bibio and Viesques stations are rectangular in shape, 165 m-long x 19 m-wide. They will be built using the cut-and-cover method at a depth of 34 and 30 m respectively.Other works require include a 300 m exploratory tunnel and two launch shafts in Begoí±a. The tunnel will be TBM-driven using a shield machine with a cutting head for rock and looser ground able to work in open and closed mode.Time frame for construction is 40 months. Tender value €116.6 million. Project planning and engineering by Ineco. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=195159-2002, OJ S 245, or contact Ministry of development, Madrid, fax +34 915979942 or 8470. E-mail vrpascual@mfom.es or cpublic@mfom.es. Read E-News Weekly # 50. 52/02. Open call for bids, deadline 17th February, 2003 for engineering services for work control and construction management of the 3.5 km cross-city tunnel. Tender value: €3.3 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=007449-2003, OJ S 10, or contact Ministry of development, Madrid, fax +34 915979942 or 8470. E-mail cpublic@mfom.es 04/03. The Ministry of development has already received eight bids for the 3.53 km penetration tunnel of the metrotrain from El Humedal to Viesques budgeted at €116.5 million with a time frame for construction of 40 months. The bidders are Corsí¡n-Corviam / Comsa; FCC / Convensa; Aldesa / Paraí±o / Tableros y Puentes / Dicaminos; Dragados / Tecsa; OHL / Coprosa / Agrupacií³n Guinovart & Obras y Servicios Hispania; ACS / Ví­as y Construcciones / Obras Subterrí¡neas; Sacyr / Constructora Hispí¡nica / Cavosa; and Necso, the only contractor to bid alone. 08/03. Necso has clinched a €91.3 million contract to build the 3,538 m-long 9.6 m-diameter double-track cross city tunnel running from El Humedal to Viesques. The job also includes three underground stations, a 300 m exploratory tunnel and two shafts. TBM-driven tunnel using a shield machine with a cutting head for rock and looser ground able to work in open and closed modes. Necso is currently in talks with TBM makers. Visit www.necso.es 17/03. Necso has placed an order with Herrenknecht for the supply of an EPB TBM to excavate a 3,538 m-long railway tunnel running from the existing station in El Humedal to Viesques with stations in Begoí±a, El Bibio and Viesques. The first station will be mined while the other two will be built in cut-and-cover. The 85 m-long machine (with backup) weighs 1,500 tons and will be equipped with a 10.56 m-diameter cutting head. The installed power will be 5,000 kW and the cutterhead power 3,600 kW. The nominal torque will be 26,026 kNm at 0.89 rev/min. The nominal thrust will be 17,500 kN. The cutting head will be equipped with 192 scrappers, 37 cutters and one copy cutter. There will be a segment erector and the excavated material will be mucked out using a conveyor belt. Visit www.herrenknecht.com. 21/03.Necso has started on shaft construction for the 3.5 km-long x 9.6 m-diameter leg of the Metrotren project from El Humedal to Viesques which will be driven by a new Herrenknecht EPB. Visit www.necso.com 34/03.Open invitation to tender, deadline 19th February, 2004 for consulting and assistance during auscultation of the city rail tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=011774-2004, OJ S 14, or contact Ministry of public works, Madrid, fax +34 915979342 or 8470. E-mail vrpascual@mfom.es. Read E-News Weekly 5/2004. 05/04.Ineco, Geocisa and Geoconsult Espaí±a have won a EUR1.5 million contract for auscultation during excavation of the city rail tunnel. Visit www.ineco.es, www.geocisa.com and www.geoconsult.es 27/04.Open call for tenders, deadline 21st September, 2005 for conceptual design of the tunnel extension to Cabuenes of the metro train line. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=156146-2005, OJ S 156, or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@mfom.es or cpublic@mfom.es. Subscribe to E-News Weekly 20/2005. 36/05.Ineco signed a EUR362,000 contract for the conceptual design of the tunnel extension to Cabuenes of the metro train line in Gijon. Read E-News Weekly 20/2005. Visit www.ineco.es 50-51/05.Open call for tenders, deadline 20th June, 2007 for design of the 2.6 km extension of the metro train to Cabueí±es. An EPB TBM instead of the cut and cover method will be used to bore the new tunnel from La Guia to Cabueí±es. Planners estimate mechanised tunnelling is more economical, has less impact on the environment and will reduce the construction time. The gradient ranges from 5% to 25%. Geology consists of medium to poor ground, probably with fractured zones (dolomites, limestone, dolomitic limestone, lutites and marly siltstone) and Quaternary soils (clay, alluvium). A mined or cut-and-cover tunnel will connect the existing TBM-built tunnel with its future extension. Read E-News Weekly 1/2007, 25/2006, 9/2006, 20/2005, 42/2004 & 36/2004. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=104362-2007, OJ S 85, or contact the Ministry of Development, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@fomento.es or cpublic@fomento.es 19/07.Open call for tenders, deadline 18th June, 2007 to design the Universidad Laboral and Cabueí±es Hospital stations, to be built in cut and cover. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=102167-2007, OJ S 83, or contact the Ministry of Development, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@fomento.es or cpublic@fomento.es 19/07.AEPO signed a EUR855,000 design contract for the 2.6 km extension of the metro train to Cabueí±es. An EPB TBM will be used to bore the new tunnel. Visit www.aepo.es 33/07.KV Consultores pocketed a EUR1.3 million contract to design the stations on the metro train extension to Cabueí±es (Plaza de Europa, El Bibio, Universidad Laboral, Cabueí±es and Viesques, the latter being a technical and service station only). Visit www.kvconsultores.es 33/07.



Permalink

Spain, Asturias-Castilla & Léon - es/55

High Speed Railway

Closing Date: 10.09.2019 (Tender Closed)

Open invitation to tender, deadline 10/09/2019, for technical assistance for control and monitoring of electric traction substation works and associated auto - transformation centres, power remote control and double 20kv line on the La Robla - Pola de Lena section (Pajares bypass). Value of the contract is EUR447,869.65, excluding VAT. Duration of the contract will be 10 months. Contact Adif-Alta Velocidad, attn Rosa Samper, Madrid, tel +34 913007589, fax +34 917674490, email RSAMPER@ADIF.ES. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=358453-2019.

Ref.n. 3.19/20830.0192.  32/19.



Permalink

Spain, Barcelona - es/48

Metro

    Preannouncement of invitation to tender for design and construction of metro line 9 from Sagrera to Can Peixauet, Can Zam and Gorg. Contact GISA, fax +34 9 34 300124. Monitor http://ted.eur-op.eu.int 14/01. Three open invitations to tender, deadline 17th July, 2001, for 10 km-long x 11.9 m-diameter section of line 9 with thirteen 35-65 m-deep stations. Y-shaped line will run from Gorg and Can Zam to Bon Pastor and on to Sagrera Meridiana in mixed ground requiring hardrock TBM and EPB. Commencement early-2002 for completion end-2004. Further 30 km with 30 stations in design to be tendered as three sections. Contact fax +34 934 300124 or visit www.gisa.es 27/01. Two contracts awarded by the Catalan government for Line 9 to connect Gorg in Badalona and Can Zam in Santa Coloma, both forming the upper branches of a Y, with Parc Logí­stic. First section is open cut. Pta48.6 billion second section including subsections from Bon Pastor to Gorg and from Parc Logí­stic up to Zona Universitaria secured by Dragados, Necso, Comsa, ACS, and Sorigué. EPB shield to be used with launch shafts in Zona Universitaria and Gorg. Time frame of 54 months. Pta64.4 billion third section including subsections from Can Zam to Bon Pastor and from Zona Universitaria to Sagrera scooped by FCC, OHL, Ferrovial-Agromí¡n and Copisa. EPB TBM. Time frame of 64 months. All tunnels 10.9 m-diameter with two levels for both directions. Excavation to start in 2002 at a depth of 35-60 m. Three machines needed altogether. Section between Can Zam, Gorg and Sagrera to open in 2004. Sagrera-Parc Logí­stic stretch to open in 2006. Visit www.gencat.es and www.gisa.es 44/01. A jv of Riazu, Tec-Cuatro, and GPO Ingenierí­a has secured the work supervision for a 3 km section of Line 9 for €1.8 million. Visit www.gencat.es and www.gisa.es 51/01. Work supervision for the bulk of Line 9, including the bored tunnels, awarded to Paymacotas and Nicola Della Valle for €16.4 million. Visit www.paymacotas.com and www.nicdv.it 03/02. Open call for bids, deadline 25th February, 2003 for construction of the infrastructure and stations for Line 9, section 1 Airport-Parc Logí­stic, subsection Llobregat-Parc Logí­stic, and section 2 Parc Logí­stic-Zona Universitaria, subsection Parc Logí­stic-Fira. Includes the construction of stations Mercabarna, Parc Logí­stic and Fira de Barcelona, and one tunnel between river Llobregat and the Fira station. Tender value: €149.2 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001119-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03. The 44 km-long line 9 will be the longest in Europe connecting Badalona and Santa Coloma de Gramanet with the port and the airport, running through the exhibition and fair area. It is also the first metro line in the world for trainsets in each direction in a single two-level tunnel. The project requires to invest approximately €2 billion. Construction will not be finished before mid-2007. 02/03. Open call for bids, deadline 25th February, 2003 for structural work inside the section 2 tunnel, track laying and catenary installation. Tender value: €71.9 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001115-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.Open call for bids, deadline 25th February, 2003 for construction of the tunnel on section 2 Parc Logí­stic-Zona Universitaria, subsection Bifurcacií³, section Bifurcacií³-Fira. Tender value: €93.7 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001107-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.Open call for bids, deadline 25th February, 2003 for construction of the stations on section 2 Parc Logí­stic-Zona Universitaria, subsection Zona Universitaria-Bifurcacií³, and subsection Bifurcacií³-Start shaft in Motors street. Tender values: €63.4 million and €57.8 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001117-2003 and http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001118-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.Open call for bids, deadline 25th February, 2003 for construction of infrastructure, stations, workshops and depots on section 2 Parc Logí­stic-Zona Universitaria, subsection Start shaft in Motors street-Zona Franca Zal. Tender value: €154.9 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001108-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.Open call for bids, deadline 25th February, 2003 for structural works inside section 3 tunnel, track laying and catenary installation. Tender value: €59.1 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001109-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.Open call for bids, deadline 25th February, 2003 for construction of stations Zona Universitaria, Campus nord, Manuel Girona and ventilation shafts, section 3 Zona Universitaria-Sagrera Meridiana. Tender value: €41.7 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001111-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.Open call for bids, deadline 25th February, 2003 for construction of stations Prat de la Riba, Sarrií , Mandri and ventilation shafts, section 3 Zona Universitaria-Sagrera Meridiana. Tender value: €49.7 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001112-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.Open call for bids, deadline 25th February, 2003 for construction of stations Putxet, Lesseps, Muntanya and ventilation shafts, section 3 Zona Universitaria-Sagrera Meridiana. Tender value: €39.3 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001116-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.Open call for bids, deadline 25th February, 2003 for construction of stations Sanllehy, Guinardí³, Maragall and ventilation shafts, section 3 Zona Universitaria-Sagrera Meridiana. Tender value: €42.3 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001120-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.Open call for bids, deadline 25th February, 2003 for installation of escalators and lifts in the 40 stations. Tender value: €52.9 million and €58.8 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001110-2003 and http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001121-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.Open call for bids, deadline 25th February, 2003 for installation of ticketing equipment. Tender value: €28.3 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001113-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.The total budget of these tenders amounts to €963 million. The administration will pay for the works, interests included, as the construction companies complete and commission the sections.To date, section 4 has been fully awarded (Can Zam and Gorg branches to Sagrera-Meridiana) and work is underway as well as the tunnels on almost all section 2 and all section 3. It is foreseen that section 4 will be operational in 2004. Open call for bids, deadline 25th February, 2003, for construction of the infrastructure and stations of line 9, section 1 Airport-Parc Logí­stic, subsection km 4+500 to Llobregat. Budget: €197.6 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=002625-2003, OJ S 4, or contact GISA, Barcelona, fax +34 934300124. 03/03.Open call for bids, deadline 25th March, 2003, for design and construction of the telecom systems for line 9. Traction substations, power substations and energy distribution system. Budget: €161.2 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=002632-2003, OJ S 4, or contact GISA, Barcelona, fax +34 934300124. 03/03. Open invitation to tender, deadline 11th April, 2003 for work supervision of Line 9, section 2 Parc Logí­stic-Zona Universití ria, subsection Bifurcacií³, stretch Bifurcacií³-Fira, and subsection Start shaft in Motors street-Zona Franca Zal. Tender value: €6 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=031751-2003, OJ S 37, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03.Open invitation to tender, deadline 15th April, 2003 for work supervision of Line 9 for the ATC, signalling and Centralized Control Room as well as the platform edge doors (PEDs) system. Tender value: €3.2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035370-2003, OJ S 41, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03.Open invitation to tender, deadline 15th April, 2003 for work supervision of Line 9, section 1 Airport-Parc Logí­stic, subsections Airport Terminal to km 4+500, km 4+500 to Llobregat and Llobregat to Parc Logí­stic, and section 2 Parc Logí­stic-Zona Universitaria, subsection Parc Logí­stic-Fira. Tender value: €10.5 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035364-2003, OJ S 41, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03.Open invitation to tender, deadline 15th April, 2003 for work supervision for the stations of Line 9, section 2 Parc Logí­stic-Zona Universitaria, subsections Zona Universitaria-Bifurcacií³ and Bifurcacií³-Start shaft in Motors street. Tender value: €4 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035381-2003, OJ S 41, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03.Open invitation to tender, deadline 15th April, 2003 for work supervision of Line 9 for telecom systems, traction substations, power substations and energy distribution system. Tender value: €3.5 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035374-2003, OJ S 41, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03.Open invitation to tender, deadline 15th April, 2003 for work supervision of Line 9 for the ticketing system, and installation of elevators and escalators. Tender value: €2.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035371-2003, OJ S 41, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03. Open invitation to tender, deadline 11th April, 2003 for work supervision of Line 9, section 2 Parc Logí­stic-Zona Universití ria, subsection Bifurcacií³, stretch Bifurcacií³-Fira, and subsection Start shaft in Motors street-Zona Franca Zal. Tender value: €6 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=031751-2003, OJ S 37, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03.Open invitation to tender, deadline 15th April, 2003 for work supervision of Line 9 for the ATC, signalling and Centralized Control Room as well as the platform edge doors (PEDs) system. Tender value: €3.2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035370-2003, OJ S 41, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03.Open invitation to tender, deadline 15th April, 2003 for work supervision of Line 9, section 1 Airport-Parc Logí­stic, subsections Airport Terminal to km 4+500, km 4+500 to Llobregat and Llobregat to Parc Logí­stic, and section 2 Parc Logí­stic-Zona Universitaria, subsection Parc Logí­stic-Fira. Tender value: €10.5 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035364-2003, OJ S 41, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03.Open invitation to tender, deadline 15th April, 2003 for work supervision for the stations of Line 9, section 2 Parc Logí­stic-Zona Universitaria, subsections Zona Universitaria-Bifurcacií³ and Bifurcacií³-Start shaft in Motors street. Tender value: €4 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035381-2003, OJ S 41, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03.Open invitation to tender, deadline 15th April, 2003 for work supervision of Line 9 for telecom systems, traction substations, power substations and energy distribution system. Tender value: €3.5 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035374-2003, OJ S 41, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03.Open invitation to tender, deadline 15th April, 2003 for work supervision of Line 9 for the ticketing system, and installation of elevators and escalators. Tender value: €2.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035371-2003, OJ S 41, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03. The construction of the tunnel on section 2 Parc Logí­stic-Zona Universitaria, subsection Bifurcacií³, section Bifurcacií³-Fira on Line 9 has been commissioned to FCC, Copisa and Comapa for €74.2 million. Visit www.gisa.es, www.fcc.es and www.copisa.com 22/03.Dragados, Copcisa, Construcciones Rubau and Comapa have been appointed to build the infrastructure, stations, workshops and depots on section 2 Parc Logí­stic-Zona Universitaria, subsection Start shaft in Motors street-Zona Franca Zal. Contract value: €128.9 million. Visit www.gisa.es, www.dragados.es and www.copcisa.com 22/03.Dragados, Necso, Comsa, ACS and Sorigué have scooped a €59 million contract for structural works inside the section 2 tunnel, track laying and catenary installation, section Start shaft in Motor street-Zona Universitaria. Visit www.gisa.es, www.dragados.es and www.necso.es 22/03.Copisa, FCC, Copcisa, OHL and Ferrovial-Agromí¡n have been awarded a €51 million contract for structural works inside section 3 tunnel, track laying and catenary installation on section Zona Universitaria-Sagrera Meridiana. Visit www.gisa.es, www.copisa.com and www.fcc.es 22/03.A JV of Dragados, Necso, Comsa and Sorigué has won for €124 million the construction of the infrastructure and stations, section 1 Airport-Parc Logí­stic, subsection Llobregat-Parc Logí­stic, and section 2 Parc Logí­stic-Zona Universitaria, subsection Parc Logí­stic-Fira. Includes the construction of stations Mercabarna, Parc Logí­stic and Fira de Barcelona, and one tunnel between river Llobregat and Fira station. Visit www.gisa.es, www.dragados.es and www.necso.es 22/03.The stations on section 2 Parc Logí­stic-Zona Universitaria, subsection Zona Universitaria-Bifurcacií³ will be built by Dragados, Necso and ACS at a cost of €54.7 million. Visit www.gisa.es, www.dragados.es and www.necso.es 22/03.The stations on section 2 Parc Logí­stic-Zona Universitaria, subsection Bifurcacií³-Start shaft in Motors street will be built by Scrinser, Comsa and Sorigué for €49.8 million. Visit www.gisa.es and www.comsa.es 22/03.Corsí¡n-Corviam will construct stations Zona Universitaria, Campus nord, Manuel Girona and the ventilation shafts on section 3 Zona Universitaria-Sagrera Meridiana. Contract value: €35.6 million. Visit www.gisa.es and www.corsan-corviam.es 22/03.Copcisa, FCC, Ferrovial-Agromí¡n, OHL and Copisa will build stations Prat de la Riba, Sarrií , Mandri and the ventilation shafts on section 3 Zona Universitaria-Sagrera Meridiana. Contract value: €42.3 million. Visit www.gisa.es, www.copcisa.com and www.fcc.es 22/03.Copcisa, FCC, Ferrovial-Agromí¡n, OHL and Copisa will also build stations Putxet, Lesseps, Muntanya and the ventilation shafts on section 3 Zona Universitaria-Sagrera Meridiana. Contract value: €33.6 million. Visit www.gisa.es, www.copcisa.com and www.fcc.es 22/03.Copcisa, FCC, Ferrovial-Agromí¡n, OHL and Copisa will finally build stations Sanllehy, Guinardí³, Maragall and the ventilation shafts on section 3 Zona Universitaria-Sagrera Meridiana. Contract value: €36 million. Visit www.gisa.es, www.copcisa.com and www.fcc.es 22/03.FCC, Ferrovial-Agromí¡n, OHL, Scrinser and Copisa will construct the infrastructure and stations on section 1 Airport-Parc Logí­stic, subsection km 4+500 to Llobregat. Contact value: €169 million. Visit www.gisa.es, www.fcc.es and www.ferrovial.es 22/03.Indra Sistemas and Sainco Trí¡fico have won a €22.9 million contract for the supply and installation of the ticketing equipment. Visit www.gisa.es, www.indra.es and www.saincotrafico.com 22/03.ThyssenKrupp Elevadores has won a €28.4 million contract for the supply and installation of escalators and another contract worth €32.3 million for the supply and installation of lifts in the 40 stations. Visit www.gisa.es and www.thyssenkrupp.com 22/03.A JV between Agelèctric, Elecnor, Emte, Instalaciones Inabensa and Isolux Wat has secured a €130.7 million design and equipment contract for line 9 including the telecom systems, the traction substations, the power substations and the energy distribution system. Visit www.elecnor.es, www.grupemte.com, www.inabensa.com and www.isolux.es. Work supervision goes to Auditorí­as e Ingenierí­as and Sener for €2.9 million. Visit www.sener.es 29/03.Typsa, Europrincipia and Idom have won a €3.26 million contract for work supervision for the stations on section 2 Parc Logí­stic-Zona Universitaria, subsections Zona Universitaria-Bifurcacií³ and Bifurcacií³-Start shaft in Motors street. Visit www.typsa.es and www.idom.es 29/03.GPO Ingenierí­a, Catalana d'Ingenyeria and Payma Cotas have won a €4.3 million contract for work supervision of stations Campus nord, Manuel Girona, Prat de la Riba, Sarrií , Mandri, Putxet, Lesseps, Muntanya and the associated ventilation shafts on section 3 Zona Universitaria-Sagrera Meridiana. Visit www.gpo.es and www.paymacotas.com 29/03.A JV between Payma Cotas, Riazu and Tec-Cuatro has pocketed a €8.5 million contract for work supervision of the infrastructure and stations on section 1 Airport-Parc Logí­stic, subsections Airport terminal to Km 4+500, Km 4+500 to Llobregat, Llobregat to Parc Logí­stic, and section 2 Parc Logí­stic-Zona Universitaria, subsection Parc Logí­stic-Fira. 29/03.A JV of AZM Ingenyers, SGS Tecnos, Ardanuy Ingenierí­a and Sener has gained a €1.8 million contract for work supervision of the ticketing system, elevators and escalators. Visit www.ardanuy.com and www.sgs.es 29/03.Sener has won a €2.6 million contract for work supervision for the ATC, signalling and Centralized Control Room as well as the platform edge doors (PEDs) system. 29/03.Open call for bids, deadline 9th February, 2004 for construction of section Airport-Parc Logí­stic, subsection Terminal station between runways-Km 4+500. Cut-and-cover method from Terminal station between runways to Km 1+250 and EPB TBM. The tunnel will accomodate two tracks and feature an outer diameter of 9.07 m and inner diameter of 8.43 m. Includes also three cut-and-cover stations. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220683-2003, OJ S 248, or contact GISA, Barcelona, fax +34 934444488. Visit dlh@gisa.es 02/04.GISA has awarded the construction of subsection Terminal between runways-Km 4+500 of Line 9 between the airport and Parc Logistic which will connect the Mas Blau business park to the new airport terminal to a JV between FCC, Ferrovial-Agroman, Scrinser, OHL and Copisa. The contract is worth EUR139 million. Work will commence by two months and last 20 months. The section is 3,934 m in length, whereof 3,050 m in tunnel, with three stations temporarily known as Terminal entre pistas, Terminal actual and Mas Blau. The double-track tunnel features an outer diameter of 9.4 m and an inner diameter of 8.4 m. Visit www.fcc.es, www.ferrovial.com, www.ohl.es and www.copisa.com 14/04.Open call for bids, deadline 10th May, 2004 for construction of the Sagrera Meridiana interchange on Line 9. Tender value: EUR105.9 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=051109-2004, OJ S 60, or visit GISA, Barcelona, fax +34 934444488. E-mail dlh@gisa.es 16/04.It was initially planned to construct in open cut the subsection running from Sagrera-Meridiana to the exit shaft of the TBMs near the future high speed station in La Sagrera. Because of a planning clash between the construction of this subsection and the future high speed railway station, the project has been modified and will be TBM-driven. GISA has awarded the construction of this subsection, running from Onze de Setembre station to Sagrera-Meridiana to Dragados, Necso, Comsa, ACS and Sorigué for EUR89.8 million and a time frame to complete the job of 24 months. The contract also includes an extension to Line 4 from Santander to Sagrera TAV and Sagrera-Meridiana, with a 12 m-diameter tunnel and the new Line 4 station at Sagrera-Meridiana. The Sagrera TAV - Sagrera-Meridiana stretch of Line 4 will be used by Line 9 trains while the Onze de Setembre - Sagrera-Meridiana parallel section is used for spoil removal when work continues on Line 9 between Sagrera-Meridiana and Zona Universití ria. The new Line 4 section will be commissioned as Line 9 without being connected to La Pau, the current head of the line. Construction of both sections implies therefore that Lines 9 and 4 will run in parallel in separated tunnels between Sagrera TAV and Sagrera Meridiana. Sagrera-Meridiana will also be an interchange station between four metro lines (4, 9, 1 and 5) and the Renfe station. These companies are currently excavating the Gorg-Bon Pastor section by means of a 12.06 m-diameter Herrenknecht EPB shield. This machine has excavated over 1 km and recently passed Llefia station. The other EPB shield, 11.95 m in diameter, built by NFM Technologies launched from Can Zam on 20th June, 2003 is on schedule, having driven 1.7 km. The machine is between Singuerlin and Esglesia stations. Visit www.gisa.es, www.gencat.net, www.herrenknecht.com and www.nfm-technologies.com 16/04.Open call for bids, deadline 19th July, 2004 for work management of the Sagrera Meridiana interchange on Line 9 of the Barcelona metro. Tender budget: EUR3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=086071-2004, OJ S 105, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 25/04.Comsa, Scrinser and Isolux Wat will construct Sagrera Meridiana interchange on Line 9, for EUR75.1 million. Visit www.comsa.com 30/04.Idom, Europrincipia and Typsa have secured a EUR2.3 million contract for work management of the Sagrera Meridiana interchange on Line 9 of the Barcelona metro. Visit www.idom.es, www.europrincipia.es and www.typsa.com 45/04.Open call for tenders, deadline 2nd September, 2005 for quality control during construction of the infrastructure and stations on section 4t Bon Pastor-Can Zam and the tunnel on the Zona Universitaria-Sagrera Meridiana section and during the design of the infrastructure and station of the access to the railway triangle, as part of Line 9 of the Barcelona metro. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=133995-2005, OJ S 135, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 29/05.Open call for bids, deadline 2nd September, 2005 for quality control during construction of the infrastructure, stations, workshops and depots on section 2 Parc Logistic-Zona Universitaria, subsection Start shaft in Motors street-Zona Franca Zal. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=134039-2005, OJ S 135, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 35/05.Open call for bids, deadline 2nd September, 2005 for quality control during construction of section 2n Parc Logistic-Zona Universitaria, subsection Bifurcacion, section Bifurcacion-Fira. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=134038-2005, OJ S 135, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 35/05.Open call for bids, deadline 2nd September, 2005 for quality control during construction of the infrastructure and stations on section 4t Bon Pastor-Gorg, of the tunnel on section Parc Logistic-Zona Universitaria and of the infrastructure and stations on subsection Sagrera-TBM shaft (end of section at Sagrera high speed rail-Bon Pastor). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=134026-2005, OJ S 135, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 35/05.Open call for tenders, deadline 12th December, 2005 for design of the modified project for Line 9, stations on the subsection Zona Universitaria-Bifurcacion (Gornal, Torrassa, Collblanc, Campus Sud and Zona Universitaria). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=201911-2005, OJ S 204, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 45/05.Open call for tenders, deadline 12th December, 2005 for design of the modified project for Line 9, subsection Llobregat-Fira. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=201909-2005, OJ S 204, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 45/05.Open call for tenders, deadline 12th December, 2005 for design of the modified project for Line 9, subsection Parc Logistic-Zona Universitaria. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=202045-2005, OJ S 204, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 45/05.Open call for tenders, deadline 12th December, 2005 for design of the modified project for Line 9, subsection TBM shaft-Sagrera Meridiana. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=201956-2005, OJ S 204, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 45/05.Payma Cotas won a EUR530,000 contract to undertake the quality control during construction of the infrastructure and stations on section 4t Bon Pastor-Can Zam and the tunnel on the Zona Universitaria-Sagrera Meridiana section and during the design of the infrastructure and station of the access to the railway triangle, as part of Line 9 of the Barcelona metro. Visit www.paymacotas.comEptisa secured a EUR590,000 contract to undertake the quality control during construction of the infrastructure and stations on section 4t Bon Pastor-Gorg, of the tunnel on section Parc Logistic-Zona Universitaria and of the infrastructure and stations on subsection Sagrera-TBM shaft (end of section at Sagrera high speed rail-Bon Pastor). Visit www.eptisa.es 47/05.Eptisa also secured a EUR303,300 contract to undertake the quality control during construction of section 2n Parc Logistic-Zona Universitaria, subsection Bifurcacion, section Bifurcacion-Fira. Visit www.eptisa.es 47/05.LGAI Technological Center and Applus Construccií³n Técnica pocketed a EUR887,300 contract to undertake the quality control during construction of the infrastructure, stations, workshops and depots on section 2 Parc Logistic-Zona Universitaria, subsection Start shaft in Motors street-Zona Franca Zal. Visit www.lgai.es and www.appluscorp.com 47/05.Open call for bids, deadline 10th April, 2006 for design of the airport loop on section 1 Airport-Logistic Park, between Mas Blau station (not included in the contract) at Km 0.750 of the original project and the terminal station between the runways (Km 3.595 in the original project). The alignment change to the project originally designed in 2002 is motivated by the need to serve the new airport city under development northeast of the airport. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=040175-2006, OJ S 37, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 09/06.Auding secured a EUR304,000 contact to design the modified project for Line 9, subsection TBM shaft-Sagrera Meridiana. Visit www.auding.com 12/06.Tec-Cuatro, Intraesa and Geocontrol received three contracts to design the modified project for Line 9. The first contract, worth EUR210,800, is to design subsection Parc Logistic-Zona Universitaria. The second contract is to design the stations on subsection Zona Universitaria-Bifurcacion (Gornal, Torrassa, Collblanc, Campus Sud and Zona Universitaria). It is worth EUR370,700. The third contract is to design subsection Llobregat-Fira. It is worth EUR210,340. Visit www.tec-cuatro.es, www.intraesa.com and www.geocontrol.es 12/06.Open call for tenders, deadline 2nd May, 2006 for conceptual design of section 3r Zona Universitaria-Sagrera meridiana on Line 9 of the Barcelona metro. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=054507-2006, OJ S 52, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 13/06.The call for tenders for the conceptual design of section 3r Zona Universitaria-Sagrera meridiana on Line 9 of the Barcelona metro has been cancelled. Click es/48. 19/06.Open call for tenders, deadline 29th May, 2006 for general supervision of safety and health during construction of Line 9 of the Barcelona metro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=088116-2006, OJ S 83, or contact GISA, Barcelona, fax +34 93 4444488. E-mail contractacio@gisa.es 20/06.Peyco and Inpasa secured a EUR563,500 contract to design the airport loop (tunnel, stations and ventilation shaft) on section 1 Airport-Logistic Park, between Mas Blau station (not included in the contract) at chainage 0.750 of the original project and the terminal station between the runways (chainage 3.595 in the original project). Visit www.peyco.es 23/06.Darzal Consultoria y Prevencion received a EUR327,600 contract for general supervision of safety and health during construction of Line 9 of the Barcelona metro. 29/06.Open call for tenders, deadline 15th September, 2006 for quality control on Line 9 on the Barcelona metro, section 1 Airport- Parque Logistico, subsection Terminal between runways-Ch 4,500 and Ch 4,500-Llobregat. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=158878-2006, OJ S 147, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 33-34/06.Open call for tenders, deadline 15th September, 2006 for quality control on Line 9 on the Barcelona metro, section 2 Parque Logistico-Zona Universitaria, subsection Parque Logistico-Fira, and section 1 Airport-Parque Logistico, subsection Llobregat-Parque Logistico. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=158874-2006, OJ S 147, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 33-34/06.Open call for tenders, deadline 15th September, 2006 for quality control on Line 9 on the Barcelona metro, section 2 Parque Logistico-Zona Universitaria, subsection Bifurcacion-Launch shaft in Motors Street. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=158866-2006, OJ S 147, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 33-34/06.Open call for tenders, deadline 18th September, 2006 for quality control of studies and projects for Line 9 of the Barcelona metro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=es&docid=161116-2006, OJ S 149, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 33-34/06.Open call for tenders, deadline 26th September, 2006 for conceptual design of section 3, Zona Universitaria-Sagrera Meridiana (tunnel and stations) on Line 9 on the Barcelona metro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=169694-2006, OJ S 157, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 35/06.Intemac received a EUR540,300 contract for quality control on Line 9 on the Barcelona metro, section 2 Parque Logistico-Zona Universitaria, subsection Parque Logistico-Fira, and section 1 Airport-Parque Logistico, subsection Llobregat-Parque Logistico. Visit www.intemac.es 46/06.Payma Cotas won a EUR260,800 contract for quality control on Line 9 of the Barcelona metro, section 2 Parque Logistico-Zona Universitaria, subsection Bifurcacion-Launch shaft in Motors Street. Visit www.paymacotas.com 46/06.LGAI Technological Center secured a EUR835,300 contract for quality control on Line 9 on the Barcelona metro, section 1 Airport-Parque Logistico, subsections Terminal between runways-Ch. 4+500 and Ch. 4+500-Llobregat, and Fira station on section 2. Visit www.lgai.es 46/06.Typsa has bagged a EUR1.2 million contract for quality control of studies and projects for Line 9 of the Barcelona metro. Visit www.typsa.es 46/06.Open call for tenders, deadline 2nd January, 2007 for quality control during construction of the Zona Universitaria-Bifurcacion subsection on section 2 Parc Logistic-Zona Universitaria on Line 9. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=232019-2006, OJ S 216, or contact GISA, Barcelona, fax +34 934444488. E-mail cpublic@mfom.es 50/06.Payma Cotas received a EUR290,000 contract to control quality during construction of the Zona Universitaria-Bifurcacion subsection on section 2 Parc Logistic-Zona Universitaria on Line 9. Visit www.paymacotas.com 08/07.Open invitation to tender, deadline 20th May, 2008 for safety and health coordination for Line 9 of the Barcelona metro related to subsection Bifurcacií³n-Fira, in particular ground improvement; subsection Entry shaft in Motors Street-Zona Franca Zal (infrastructure, stations, workshops and rolling stock depot); subsection Zona Universitaria-Bifurcacií³n (stations); Torrassa interchange station; subsection Bifurcacií³n-Entry shaft in Motors Street and its stations; subsection Entry shaft in Motors Street-Zona Universitaria (complementary interior fit-out, tracks and catenaries as well as ground improvement measurements); and section Parc Logistic-Zona Universitaria (tunnel). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=86772-2008, OJ S 64, or contact GISA, Barcelona, fax +34 934444488. E-mail correu@gisa.es 15/08.Open invitation to tender, deadline 2nd June, 2008 for safety and health coordination for Line 9 of the Barcelona metro related to the infrastructure, stations and installations of several sections. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=98894-2008, OJ S 73, or contact GISA, Barcelona, fax +34 934444488. E-mail correu@gisa.es 17/08.Open invitation to tender, deadline 9th June, 2008 for design for stations Zona Universitaria, Campus Norte, Manuel Girona and ventilation shafts, as part of the revised section 3 Zona Universitaria-Sagrera Meridiana of Line 9 of the Barcelona metro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=104396-2008, OJ S 77, or contact GISA, Barcelona, fax +34 934444488. E-mail correu@gisa.es 18/08.Open invitation to tender, deadline 16th July, 2008 for work control and construction supervision of the New airport terminal-Parc Logistic section 1r. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=136952-2008, OJ S 102, or contact GISA, Barcelona, fax +34 934444488. E-mail esm@gisa.cat 23/08.Open invitation to tender, deadline 16th July, 2008 for work control and construction supervision of the Parc Logistic-Bifurcation shaft and Zona Franca entry shaft-Zona Universitaria section 2n. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=136951-2008, OJ S 102, or contact GISA, Barcelona, fax +34 934444488. E-mail esm@gisa.cat 23/08.Open invitation to tender, deadline 16th July, 2008 for work control and construction supervision of the Zona Universitaria-Sagrera Meridiana section 3r and section 4t. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=136950-2008, OJ S 102, or contact GISA, Barcelona, fax +34 934444488. E-mail esm@gisa.cat 23/08.Cygsa secured a EUR565,100 safety and health coordination contract for Line 9 of the Barcelona metro related to subsection Bifurcacií³n-Fira, in particular ground improvement; subsection Entry shaft in Motors Street-Zona Franca Zal (infrastructure, stations, workshops and rolling stock depot); subsection Zona Universitaria-Bifurcacií³n (stations); Torrassa interchange station; subsection Bifurcacií³n-Entry shaft in Motors Street and its stations; subsection Entry shaft in Motors Street-Zona Universitaria (complementary interior fit-out, tracks and catenaries as well as ground improvement measurements); and section Parc Logistic-Zona Universitaria (tunnel). Visit www.cygsa.com 30/08.Payma Cotas secured a EUR468,600 safety and health coordination contract for Line 9 of the Barcelona metro related to the infrastructure, stations and installations of several sections. Visit www.paymacotas.net 30/08.Auding received a EUR1.2 million contract to design the Zona Universitaria, Campus Norte and Manuel Girona stations and ventilation shafts, as part of the revised section 3 Zona Universitaria-Sagrera Meridiana of Line 9 of the Barcelona metro. Visit www.auding.com 36/08.Prior information notice for execution of construction work at Pozo Campus Norte on Barcelona metro line 9, value EUR6 million. Contract period 14 months commencing February, 2009. http://ted.europa.eu/udl?request=Seek-Deliver&language=es&docid=267741-2008 OJ S 202 Award procedures start 10.12.2008. Contact Gestio d'Infraestructures, tel +34 9 34 44 44 44, e-mail esm@gisa.cat 43/08.ATI, a consortium of OHL, FCC Construction and Copisa, has been awarded the EUR1 billion concession for construction, maintenance and management of section 1 of line 9 of Barcelona Metro involving 13 stations and 17 km of line serving Prat airport, Llobregat hospital and the terminus at Amadeu Torner station. Line 9 will be the longest metro line in Europe at 46.6 km. Visit www.ohl.es, www.fcc.es, and www.copisa.com. 48/08.



Permalink

Sweden

Sweden, Stockholm - se/30

Power

Open call for bids, deadline 21st August, 2003 for project engineering for the Skantull-Solberga power tunnel. The complete tunnel between Skantull and Solberga via í–rby will be approximately 6.4 km in length, of which 5.1 km will be a new tunnel which will generate 90,600 cubic metres. The purpose is to move an existing aboveground power line into the tunnel. Cross sections: 17.7 sq m (new tunnel) and 12.5 sq m (existing tunnel). Geology is mostly granite. Drill/blast method from five drives. Support technique and mucking-out equipment not yet decided. Feasibility study by Scandiaconsult (SCC), WSP and Bergab. Tenders for tunnelling in April 2004. Estimated cost: SEK400 million financed by Stockholms Gatu- och fastigehetskontor. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=105172-2003, OJ S 117, or contact Stockholms Gatu- och fastigehetskontor, Stockholm, fax +46 850826301. E-mail kjell.engvall@gfk.stockholm.se and johan.arvidsson@carlbro.se 27/03.Open call for tenders, deadline 16th October, 2006 for construction of a 7 km cable tunnel from Skanstull to Solberga in south Stockholm, a work tunnel and terminal facility. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=133115-2006, OJ S 125, or contact Stockholms Stads Markkontor, Stockholm, tel. +46 84800000. E-mail tobias.kednert@mk.stockholm.se or ake.stiberg@carlbro.se 28/06.Details are available about the construction of the Skanstull-Solberga cable tunnel in Stockholm. The main tunnel includes sections of 18.3 sq m for a 5,560 m distance (height 5 m) and 20.3 sq m for a 780 m distance (height 5.5 m). For both tunnels the width is 4 m. There are also three work tunnels of 27.4 sq m with a total distance of 780 m and five vertical shafts for cables, ventilation and stairs. They are deep tunnels in rock (mainly gneiss) below the groundwater level. The new tunnel is not allowed to cause sinking of the groundwater level due to existing buildings at the surface and crossing tunnels above the new tunnel. The tunnel is planned to be built by conventional driving by jumbo and explosives in full section, but alternative solutions may be accepted. To stop groundwater, mainly drilling and concrete injection is planned. To support the rock, mainly bolts and shotcrete with and without fibres will be used. Concrete formwork at the tunnel ends. Steel construction in the five shafts. Small rooms for technical equipment are required underground. An invitation to tender is under way, for contact award in December 2006. Construction to start immediately after for end on 31st March, 2010. Click se/30. 33-34/06.Open call for tenders, deadline 29th October, 2006 for contract management for construction of the Skanstull-Solberga tunnel for electrical cables. The main responsibility of the assignment is to ensure, on behalf of the customer, that all contractual requirements are fulfilled. The contract management shall include expert advising and administrative work. Click se/30 for details about the tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=182698-2006, OJ S 171, or contact Stockholm Stad Markkontoret, Stockholm, fax +46 13312490. E-mail toblas.kednert@mk.stockholm.se or request@opic.com 38/06.Open call for tenders, deadline 22nd February, 2007 for construction of the Hjorthagen cable tunnel. This is an approx. 1.1 km tunnel, also including a vertical shaft and a 300 m work tunnel. Read E-News Weekly 41/2006 for more details. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=250227-2006, OJ S 234, or contact Markkontoret, Stockholm, fax +46 13312030. E-mail anna.pramsten@mk.stockholm.se 51-52/06.Oden Anläggningsentreprenad pocketed a SEK335 million contract to build a 7 km cable tunnel from Skanstull to Solberga in south Stockholm, a work tunnel and a terminal facility. Visit www.oden.nu 05/07.



Permalink

Invitation to tender using negotiated procedure, deadline 31.10.2011, for marine and land geotechnical and geological surveys along line of proposed TBM-bored City Link transmission tunnel for Stockholm Power division of Swedish Power. Further information, specs and docs from Rolf Axen at Svenska Kraftnaet in Sundbyberg, tel +46 702304426, e-mail rolf.axen@svk.se, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=290895-2011. 37/11.



Permalink

Page: